Home|Classified|About Us|Registration|FAQ|Global Tenders| Our Service|Advertise|Customers|Contact Us|Guest Book|


Monday November 05, 2007

Tender Details

East Central Railway
(Construction Department)

Corrigendum No. 01
     

Tender Notice No.04 (Con)/BRKA of 2007-08 (Open).
 
Tender No. 05 and 06(Con)/BRKA of 2007-08(Open)
 
Name of work:- (1)
Construction of overhead tank (50000 gallans capacity) boring of one number deep tube well,  construction of pump house, pipe line work and other ancillary works at Barkakana in connection with the construction of a new B.G. Railway line from Koderma to Ranchi via Barkakana.
 
  (2)
Renovation of existing rest house at Ranchi for use of construction organization Barkakana in connection with the construction of a new B.G. Railway line from Koderma to Ranchi via Barkakana.
 
(1)
The date of opening of above mentioned tenders is extended from 24.10.2007 to 28.11.2007 on administrative ground and tender form will be available from 13/11/07 to 27/11/07 on website and from the office of Dy.CE (Con)/Barkakana.
 
(2)
Existing item 5.3 of solvency certificate is deleted.
 
(3)
In place of existing item No. (7) the following may be read out  :-
 
Performance Guarantee (P.G.): Please note that in addition to Security Deposit, the successful Contractor will have to submit a performance Guarantee @ 5% of Contractual value in form of a Bank Guarantee Bond in token of commitment to complete the work successfully. The Performance Guarantee will have to be deposited after the Letter of acceptance has been issued but before signing of the Agreement and should be valid up to date of completion plus 60 days beyond that PG may be required to be extended further in case of extension of DOC for extended DOC plus 60 days beyond that. Details in this regard are available in the Tender document.
 
a)
Performance guarantee shall be released after satisfactory completion of the work. The procedure for releasing should be same as for security deposit.
 
b)
Whenever the contracts are rescinded the security deposit should be forfeited and the performance guarantee shall be encashed and the balance work should be got done separately.
 
c)
The balance work shall be got done independently without risk & cost of the original contractor.
 
d)
The original contractor shall be debarred from participating in the tender for executing the balance work. If the failed contractor is a JV or a partnership firm then every member/partner of such a firm would be debarred from participating in the tender for the balance work either in his/her individual capacity or as a partner of any other JV/Partnership firm.
 
All other term and conditions will remain unchanged except the above mentioned.
 

Click here to view the original tender

     

Dy.Chief Engineer (Con),

  E. C. Railway, Barkakana.


Home
|Classified|About Us|Registration|FAQ|Global Tenders|
Our Service|Advertise|Customers|Contact Us|

      ©2006-2007 Ontrack Systems Limited . All rights reserved.