|
I
|
Commodity
|
Low Ash Metallurgical
Hard Coking Coal of
Australian/Chinese origin.
|
|
II
|
Quantity
|
25,000 MT ±
10%
|
|
III
|
Quality Specification
|
|
Quality Parameters
|
Quality Guaranteed
|
Absolute Limit
|
|
1. Total Moisture (ARB)
|
8% Max.
|
---
|
|
2. Volatile Matter (ADB)
|
22 - 24%
|
20% <and> 24%
|
|
3. Ash (ADB)
|
8% to 9.5% Max.
|
>11%
|
|
4. Total Sulphur
|
0.5% to 0.7%
|
>1%
|
|
5. CSN
|
>6
|
<5.5
|
|
6. Phosphorous
|
0.02%
|
>0.05%
|
|
7. Inherent Moisture (ADB)
|
0.9% - 1.5%
|
1.5%
|
|
8. MMR of Vitrinite
|
1.05 - 1.15
|
1.0 <and>1.2
|
|
9. Vitrinite Content
|
50% - 55%
|
---
|
|
10. Maximum Fluidity (DDPM)
|
300 Min.
|
200 Min.
|
|
11. Micro fines (- 0.5 mm)
|
20 - 25% Max.
|
30% Max
|
|
12. Size 0 - 50 mm.
|
90%
|
---
|
|
13. L.T.G.K.
|
G-3
|
---
|
|
14. Vitrinite Distribution (V9-V14)
|
70%
|
Not below 60%
|
|
|
IV
|
Price
|
|
Basic Price-
|
Rs.
|
|
CST/VAT (-%)
(As applicable)
|
Rs.
|
|
Other Taxes & Charges
If any, (Pl. Specify)
|
Rs.
|
|
Rly. Freight at actuals
(To be indicated by the Seller)
|
Rs.
|
|
Toral -
|
Rs.
|
|
|
V
|
Delivery
|
Ex - Stock.
|
|
VI
|
Delivery Period
|
Delivery of material will be started within 10 days
and shall be completed within 30 days form the date of issue of
Purchase Order.
|
|
VII
|
Payment Terms
|
Provisional Payment shall be made on receipt of the
material at DPL site for 80% of the cost of the materials, 100% freight and taxes/duties (supported by documents)
within 15 (Fifteen) days from submission of the bills to DPL. Bills
in triplicate should be submitted together with documents mentioned
hereunder. The number & date of the Purchase Order should
invariable be quoted in the bills. Bills to be preferred in the name
of Addl. Sr. Manager (F&A) and to be submitted to Raw Materials
Dept. DPL. Payment will be made on rake-to-rake basis. Following
documents should be enclosed with the bills (1) Challan (2) R.R. (3)
Certificate of quality analysis carried out by an independent
Inspection Agency to be appointed by Seller (4) Seller's test &
Guarantee Certificate. Balance 20% payment shall be made within 15
(Fifteen) days of submission of the bills supported by quality
Analysis and weighment certificate carried out at DPL's end which
shall be issued within one week of the date of receipt of the consignment.
However, suitable adjustment whichever required shall be carried out
while passing the bills.
|
|
VIII
|
Mode of Despatch
|
The materials shall be dispatched by Rail from the
Port/place of dispatch to DPL - site on freight pre paid basis. The
Seller shall be responsible for making of transportation arrangement
for timely supply of materials to fulfill the delivery schedule.
The freight and other incidental charges relating to transportation,
handling, loading etc. and other statutory levies including service
tax on freight, if any, shall be borne by the seller. However,
unloading at DPL's end shall be done by DPL.
|
|
IX
|
Consignee
|
Sr. Manager (Technical)/In-Charge of Raw Materials,
The Durgapur Project Ltd., DCOP Exchange Yard, Durgapur.
|
|
X
|
Booking of wagons
|
To be arranged by Seller. Indents to be booked form
loading station to DCOP as "N - DCOP/Special".
|
|
XI
|
Quantity Certification
|
The weighment of the materials shall be done at DPL
weigh-bridge and the weight of the quantity thus recorded at DPL
weigh-bridge shall be treated as final and binding on both DPL &
Seller for the purpose of payment.
|
|
XII
|
Quality Certification
|
On receipt of materials, DPL's Agent (i.e. third party
Inspection Analyst appointed by DPL) shall collect samples and
seller may witness the collection on their own expense. The samples
collected and prepared for chemical analysis shall be divided into
three parts. First part shall be analyzed by the said Agent. The
Representative of the Seller shall collect the second part within 7
(seven) days from the date of drawing of the sample. If the Seller
does not collect the sample within stipulated period of 7 (seven)
days, DPL shall be at liberty to destroy the sample. Third part
shall be jointly sealed and signed by the authorized representative
of DPL and the Seller, if present and kept by DPL for a period of 60
Days (from the date of issue of analysis report or the Seller by
DPL) and will be referred to the Umpire in case of dispute.
Sampling and analysis carried out at DPL by the Independent Analyst
appointed by DPL shall be final and binding on the parties. In case
of any dispute the third part shall be analysed in the laboratory of
DPL in the presence of representative of the Seller. The cost of the
analysis shall be initially paid by DPL, subsequently it will be recovered
from the of the Seller in case the Seller loses. In case
samples could not be collected form any rake/wagon due to
operational reasons, the average test results during the previous 3
supplies will be applicable. If there is no supply as stated above,
the supply will be accepted against the seller's test and Guarantee
Certificate. DPL shall provide and the supplier should collect the
analysis report separately for each consignment for raising of the
bills for payment.
|
|
XIII
|
Moisture Adjustment
|
Total moisture in excess of 8% or fraction pro-rata
shall be adjusted on weighment determined by the Inspection Agency.
This shall be the net weight for the purpose of Invoicing.
|
|
XIV
|
Penalty
|
Ash: Rs. 50/- per MT for every increase of 1%
or fraction pro-rata above 9.5% up to 11%.
|
|
V.M.: Rs. 35/- per MT for every decrease
of 1% or fraction pro-rata below 22% upto 20%.
|
|
Sulphur: Rs. 35/- per MT shall be deducted for
every increase of 0.1% or fraction pro-rata above 0.70% up to 1%.
|
|
Phosphorous: Rs. 35/- per MT shall be
deducted for every increase of 0.01% or fraction pro-rata above
0.02% up to 0.05%.
|
|
CSN: Rs. 35/- per MT shall be deducted
for every decrease of 1 Unit or fraction pro-rata below 6.0 up to
5.5.
|
|
XV
|
Documents Required
|
Following documents are required to be provided along
with the tender:
1. Certificate of Origin of the tendered material.
2. Load-Port Quality analysis Report of the tendered material.
3. Name of the Vessel thru' which the material brought.
4. Copy of Bill of Lading of the tendered material.
|
|
XVI
|
E.M.D.
|
E.M.D. for an amount of Rs. 1.00 Crores (Rupees
One Crore) in the form of Pay Order or DD or Bank Guarantee from a
Nationalised scheduled Bank at Kolkata/Durgapur, shall be have to be
submitted by the bidders along with the Offer, failing which, the
'Price Bid' of the the offer shall not be opened. The EMD of
the successful bidder shall be converted in to Security Deposit and
shall be retained by DPL till completion of the deal, and for which,
no accretion shall be claimed by the bidder.
|
|
XVII
|
Submission of Tender
|
Tender should be submitted in 2 (Two) Parts:-
(a) The first part of Tender should contain the 'Requisite
amount of Earnest Money' and it is to be kept in a sealed envelope
superscribing Earnest Money against NIT No. GM (COGP)-1/CW/329 Dt.
14.07.2008.
(b) The second part of the tender should contain the "Price
Bid" along with all other copies of document as per clause 'XV'
of the tender documents and these are to be kept in a separate
sealed envelope subscribing 'Price Bid' and NIT No. GM (COGP)-1/CW/329
Dt. 14.07.2008.
(c) Offer should contain of copy of the tender enquiry duly signed
in each page as token of acceptance of enquiry terms.
|
|
XVIII
|
Validity
|
The offer submitted must remain valid, at least, for
90 (ninety) days from the date of opening of the tender.
|
|
XIX
|
Important Dates of Tender
|
-
Last date of sale of Tender: 07.08.2008
-
Date of Pre- Bid Discussion: 12.08.2008.
-
The Last Date of Submission of tender: To be fixed at Pre-Bid
Discussion
-
Date of opening of tender & Time: To be fixed at Pre-Bid
Discussion.
Tenders, as stated,
to be submitted at the following address with in the specified date.
Addl. Sr. Manager (Commercial), COGP.
The Durgapur Projectes Limited,
Laboratory Building, 1st Floor, Room No: 33
Durgapur - 713201.
|
|
XX |
Name &
Address of the Tenderor (Address of Registered Office as well as
address for correspondences with Telephone Nos., Fax Nos. &
E-Mail ID to be provided) |
|