|
2. |
In Special
Technical requirement against Sl. No. 1 of page No. 82 of Tender
document: "Single Rail, Remote Fed, Centralized mode
of operation should be considered for AFTC" should be read as "Single
Rail, Remote Fed, Coded, centralized mode of operation should be
considered of AFTC."
|
|
3. |
In Rate Schedule
against first line of Sl. No. 92 of Annexure Z Part II. (Page No.: - 225
of Tender document): "Supply of remote fed noise free AFTC
equipments, complete system, center fed/End fed as per
specification no. RDSO/SPN/146/2001 with latest amendment including
transmitter receiver, filter, De-modulator, Amplifier, relay, Electronic
Module. Power Supply etc." should be read as "Supply of
remote fed noise free Coded AFTC equipments complete systems, center
fed/End fed as per specification no. RDSO/SPN/146/2001 with latest
amendment including transmitter receiver, filter, De-modulator,
Amplifier, Relay, electronics module, Power supply etc."
|