NOTICE INVITING
TENDER
|
|
Sub: Annual maintenance contract for
electrical equipment of unit#7
|
|
Tender Notice No.-
DPL/PC/7th Unit/AMC-Electrical/2954
|
Dt- 5.9.08
|
|
Sealed tenders in
duplicable in four part bid system are invited from the bonafide
contractors having experience in the maintenance of power plant
electrical system of capacity 110 MW above for at least five years. The
bidder must have executed the same type of job of work order value not
less than Rs. 10,00,000.00 yearly (Rupees ten lakhs) only.
|
|
The cost of tender
paper is Rs. 2000.00 (Rupees two thousand) only plus VAT
(Nonrefundable)
|
|
|
Date of
tender sale
|
: |
The
tender paper will have available from the office of the
Project Manager, 7th unit cell, Administrative building,
The DPL, Durgapur - 713201 during office hours excepting
holidays if any, from 10th September, 2008 to
15th September, 2008.
|
|
Date of
pre-bid meeting
|
|
18th
September, 2008 at 15.30 hrs.
|
|
Last
date of tender submission
|
|
22nd
September, 2008 at 15.00 hrs.
|
|
Date
of opening of tender
|
|
The
part-I & part-II tender papers will be opened on 22nd
September, 2008 at 16.00 hours at Administrative building,
The D.P. Limited, Durgapur.
|
|
Earnest
Money Deposit
|
|
The
earnest money of value equivalent to 2% of the quoted
price is to be deposited along with the tender paper in
the form Bank draft / pay order or Bank Guarantee in
favour of The Durgapur Projects
Limited payable at Durgapur on any Nationalised bank or
any reputed bank having branch having branch office at
Durgapur in a separate sealed cover
mentioning Earnest Money for Tender notice No., Name
of the job and Date of opening. The Bank Guarantee
for earnest money should be valid for twelve months from
the date of opening of the tender paper. No interest
will be paid for EMD. The EMD of the unsuccessful bidder
will be refunded after the finalisation of the tender.
|
|
Duration
of the contract
|
: |
Twelve
months from the date of issuance of LOA.
|
|
Site
|
: |
DPL
power Plant, Unit #7.
|
|
Filling of Tender
|
: |
Tender
for the work will be received in four parts i.e. Part-I,
Part-II, Part-III & Part-IV each in separate sealed
cover superscribing the name of the work & NIT no.
|
|
|
|
a)
Part-I shall contain the bank draft / pay order or Bank
Guarantee against the Earnest Money.
b) Part-II shall contain Qualifying criteria
c) Part-III shall contain Techno-commercial bid.
d) Part-IV shall consist of price bid which will be
opened at a later date for the bidders who qualify in
Part-I, Part-II and Part-III.
|
|
|
|
All of
the three sealed covers Part-I, Part-II, Part-III &
Part-IV shall be put under another cover duly sealed
superscribing with Tender Notice No., Name of the work
& addressed to The General Manager (Power Plant), 7th unit
cell, The Durgapur Projects Ltd, Durgapur-713202.
Tender papers shall be submitted in
duplicate.
|
|
|
|
|
(A)
Preamble :
|
|
The Durgapur
Projects Power Station has added 1 x 300 MW, 7th Unit
extension to its 401 MW Power Station. The unit was commissioned and
commercial operation was declared in the month of April 2008. The
unit is generating 300 MW and contribution to DPL's own commending
area and State Grid. The Main plant is constructed on turnkey basin
by M/s. Dongfang Electric Corporation, P.R. China, The Durgapur
Protects Limited intents to engage external agency for the job of
preventive & break down maintenance in the area of Electrical
part on annual contract basis. The area includes switchyard control
building, 220 KV & 133 KV Switch Yard, Transformer Yard, FO Pump
house, Compressor house, Diesel Generator house, Softening Plant, CW
Pump house, Main Power house and outdoor illumination system.
|
|
(B) SCOPE OF
WORK:
|
|
i) |
Cleaning of all the
electrical equipments, cable trench, cable alley.
|
|
ii) |
Maintenance of IIT
Motors, LT Motors - Greasing, Lubricating oil top up measurement of
vibration, bearing temp, torminal tightness checking, checking of
insulation, measurement of winding resistance & inductance,
Measurement of I.R. & P.I. Values, Heat run arrangement,
Checking of motor space heater and its circuits.
|
|
iii) |
Checking of all the
transformers (370 MVA GT, 35 MVA ST, & all components related to
their Marshalling boxes. 160 MVA AT, 25 MVA UAT - 2 nos. Dry type
transformer of rating up to 2000 KVA) - oil filtration silica
gel replacement, testing of oil (From certified institutions like-CPRI,
Power Grid), Cooler cleaning & maintenance, topping up of
transformer oil, shifting of transformer oil drum from store to the
location, measurement of PI, Cooler Control & tap changer
mechanism checking, cleaning of Dry type / Oil type transformers,
Checking of temperature indicators, tightness checking, measurement
of earth resistance. Maintenance of cooling fans & motors is to
be done.
|
|
iv) |
Maintenance of 6.6
KV & 415 V switch gear - Unit bus, Station bus, 6.6 KV & 415
V boards - cleaning of Panels, breakers, bus bars, checking of
control circuits, replacement of electrical accessories viz. damaged
/ burnt out bus bar jumpers, close /trip coils, breakers poles,
adjustment of mechanism, checking of time of operation of the
breaker, Cycle test, measurement of control resistances, checking
& testing of protection relays.
|
|
v) |
Maintenance of
illumination in the Main Power house, balance of plants, approach
road & surroundings - This includes checking of DBs, incoming
source, checking & replacement of fittings, luminaries &
accessories, cleaning of reflector, glass covers, fittings,
checking, rectification & replacement of cables, wires etc.
including checking & maintenance of receptacles.
|
|
vi) |
Maintenance of 220
KV / 132 KV Switchyard - Checking & alignment correction of
isolators CB's Earth Switch CTs, CVTs and LAs. Checking of Control
Circuits, Fitting of SF6 gas. Trouble shooting of
mechanical as well as electrical problem of breakers &
isolators. Replacement of equipments where necessary like defective
connectors / breaker pads etc. measurement of Earth resistance.
Thorough cleaning of all porcelain dustings/insulators is to be done
also.
|
|
vii) |
Checking of control
wires/ cables from fields, breakers to Electrical Distribution
Management system panel & DCS panel.
|
|
viii) |
Testing of CTS PTS
Voltmeters/Ammeters, protective relays of 6.6 KV, 415V switchgear,
Testing of CTs, CVTs, LAs, CB's of 220 KV/132 KV switchgears.
|
|
ix) |
Maintenance of
battery 1875 AH X 2 sets. 490 AH X 2 Sets, 100 AH x 2.20 AH x 2
& its charges in the main power house & switchyard control
building, there are 2 sets of Plants type batteries & 2 sets of
Ni-Cadmium type batteries. Maintenance of UPS system in the Main
Power House & in the switchyard control room Periodical Checking
of Specific Gravity, cell voltage, electrical components.
|
|
x) |
Maintenance of
electrical components of EOT Crane, electrical hoists of Main Power
House & balance of plants.
|
|
xi) |
Checking, Testing
& maintenance of motor operated valve of the antire power house
& balance of plants, This job includes electrical control
circuitry checking, limit switch torque switch setting and
mechanical checking of the actuators. Replacement of defective parts
is to be done also.
|
|
xii) |
Maintenance of
Generator- Checking & cleaning of carbon brush of
Generator exciter Segregated bus duct & its compressed air
system. Testing & maintenance of Generator CT's PTs,
Neutral grounding trafo etc. Measurement of insulation resistance of
Generator & arrangement of heat run. Replacement worn-out carbon
brushes by new ones & fixing of the same. Maintenance job of
electrical equipments related to H2 gas plant & seal
oil plant are to be carried out.
|
|
xiii) |
Maintenance of
Diesel Generator sets - 2 nos. - Checking of electrical portion
including generators battery cells, panels, control circuits etc.
|
|
xiv) |
Maintenance of
electrical equipments in balance of plant area including CW Pump
House, FO Pump House, Compressors house, softening plant, chemical
dosing plant - checking of all electrical circuitry &
equipments.
|
|
xv) |
Electrical checking
of power house lift, boiler Drum lift, Mill Building lift, Chimney
lift, including statutory testing by the competent authority.
|
|
xvi) |
Checking &
maintenance of the following panels - |
|
|
A. |
Synchronizer |
|
|
B. |
Transducer &
energy meter panel |
|
|
C. |
HSBT device (High
speed bus transfer device) |
|
|
D. |
Disturbance
recorder. |
|
|
|
|
xvii) |
This scope also
includes other electrical areas which are minor in nature and have
not been mentioned in the above points.
|
|
(C) General Terms
and Conditions :
|
|
1) |
The contractor is
to follow the prevailing system of engaging manpower at the site.
|
|
2) |
The Contractor's
Supervisor must have sufficient experience in power plant field
instruments. Before engagement of the contractor's supervisor DPL will
take interview of the persons to be engaged.
|
|
3) |
The Contractor will
arrange Insurance coverage for their persons who will be working at
site.
|
|
4) |
No conveyance or
accommodation will be provided to the Contractor during the period
of contract.
|
|
5) |
The job is for
round the clock and maintenance people must be available in each
shift including holidays. The Contractor is to arrange everything
from their resource to executed the job.
|
|
6) |
The contractor is
to clear any doubt before submission of the bid. The work order once
finalised will be changed.
|
|
7) |
The bidders will
arrange their own security at the site.
|
|
8) |
Tools/Tackles
necessary for the maintenance are in the scope of the contractor.
|
|
9) |
Access to the work
site arrangement of Scaffolding shall be arranged by the contractor at his own
cost. Any preparation work for carrying out the job and incidental
charges involved will be born by the contractor.
|
|
10) |
The bidders are
requested to visit the site to assess the field condition and the
job involvement before bid submission.
|
|
11) |
Field of work
includes entire electrical system in Main Power Plant area,
Compressor House, Fuel Oil Pump house, CW Pump House, Water
Softening Plant, Chemical Dosing Plant, outdoor illumination etc.
Only DM Water Plant and
Coal Handling Plant are excluded from the field of work.
|
|
12) |
Maintenance of the
equipments, Panels, JBs etc. means cleaning, calibration, minor
repair and minor modifications as and when required. Maintenance is
to be done following a periodic schedule under the guidance of the
representative of DPL. However problems/faults to be attended
detected and rectified on emergency situations. During capital
overhauling maintenance will be done following the Master
Maintenance Schedule as well as the Departmental Maintenance
Schedule.
|
|
13) |
The contractor will
be responsible for the transportation of material from the store
within the plant premises.
|
|
(D) Cancellations
or Rejection of Tender :-
|
|
Any tender not
accompanying the legible requisite paper/documents as stipulated in
the tender document will be summarily rejected. The DPL reserve the
right to cancel any tender/tenders without assigning any reason
thereof.
|
|
(E) Penalty :
-
|
|
In case the
contractor's performance is found not satisfactory the contract will
be terminated with the forfeiture of EMD.
|
|
(F) Payment
Terms : -
|
|
95% payment for
each month will be paid against the submission of proforma invoice.
The balance 5% will be paid after the expiry of the contract period.
The price for the whole period of contract will remain firm.
|
|
(G) Taxes &
Duties : -
|
|
Any statutory taxes
& duties as applicable will be paid at actual to the submission
of proper document.
|
|
|
|
|
General Manger (PP)
|
|
Project Cell, 7th
unit
|
Website: www.thedurgapurprojectsltd.com
|