No.
J-13011/26/2007-IA-II (T)
Government of India
Ministry of Environment & Forests |
|
|
Paryavaran
Bhawan |
|
|
CGO Complex,
Lodi Road |
|
|
New Delhi -
110003 |
|
|
|
|
|
|
Dated : 20th
July, 2009. |
|
|
To |
|
|
The General
Manager (PP)
& Project Manager
The Durgapur Projects Ltd.
Administrative Building
Durgapur-713 201, West Bengal. |
|
|
|
|
|
Sub
: |
1x250
MW Extension Unit 8 at Durgapur Projects Power
Station Ltd at Durgapur, District Burdwan, West
Bengal by M/s The Durgapur Projects Ltd -
Reduction in capacity and change in unit
numbering-Environmental Clearance reg. |
|
|
|
|
|
Sir,
|
|
|
|
|
The
undersigned is directed to refer to your
communication no. MD/DPL/F148/2009/97 dated
9.6.2009 on the above mentioned subject.
|
|
2.
|
The
proposal for reduction in unit 7 A Capacity from
300 MW to 250 MW and renumbering of this
expansion unit as unit 8 instead of 7 A has been
considered by the Expert Appraisal Committee (EAC)
for Thermal Power and Coal Mine Project. On the recommendation
of the EAC, the Ministry hereby grant permission
to reduce the capacity of the expansion unit 8
from 300 MW to 250 MW with condition that a
bi-flue stack of 275 m height will be installed
for expansion units 8 and 9 instead of 220 m
single flue stack for unit 7A (now unit 8).
|
|
3.
|
Besides
above, the following additional conditions are
also stipulated for compliance.
|
|
|
Condition
No. 3 (XXII). A sewage treatment plant shall be
provided and the treated sewage shall be used
for raising greenbelt/plantation.
|
|
|
(XXIII)
Adequate safety measures shall be provided in
the plant area to check/minimize spontaneous
fires in coal yard, especially during summer
season.
|
|
|
(XXIV)
Storage facilities for auxillary liquid fuel
such as LDO and /HFO/LSHS shall be made in the
plant area in consultation with the Deptt. of
Explosives, Nagpur, Sulphur content in the
liquid fuel will not exceed 0.5%. Disaster
Management Plan shall be prepared to meet any
eventuality in case of an accident taking place
due to storage of oil.
|
|
|
(XXV)
Adequate funds shall be allocated for
undertaking CSR activities.
|
|
|
(XXVI)
First aid and sanitation arrangements shall be
made for the drivers and other contract workers
during construction phase.
|
|
|
(XXVII)
Provision shall be made for the housing of
construction labour within the also with the
side with all
necessary infrastructure and facilities
such as fuel for cooking, Mobile toilets, mobile STP,
safe drinking water medical health care, creche
etc. The housing may be in the form of temporary
structures to be removed after the completion of
the project.
|
|
|
(XXVIII)
A copy of the clearance letter shall be sent by
the proponent to concerned Panchayat, Zila
Parisad /Municipal Corporation, urban local Body
and the Local NGO, it any from whom
suggestion/representation, if any, were received
while processing the proposal. The clearance
letter shall also be put on the website or the
Company by the proponent.
|
|
|
(XXIX)
The proponent shall upload the status of
compliance of the stipulated EC conditions,
including results of monitored data on their
website and shall update the same periodically.
It shall simultaneously be sent to the Regional
Office of MOEF, the respective Zonal Office of
CPCB and the SPCB. the criteria pollutant levels
namely. SPM, RSPM, SO2 and NOx (ambient levels
as well as stack emissions) shall be monitored
and displayed at a convenient location near the
main gate of the company in the public
domain.
|
|
|
(XXX)
The environmental statement for each financial
year ending 31st March in Form-V as is mandated
to be submitted by the project proponent to the
concerned.
|
|
|
State
Pollution Control Board as prescribed under the
Environment (Protection) Rules, 1986 as amended
subsequently, shall also be put on the website
of the company along with the status of
compliance of EC conditions and shall also be
sent to the respective Regional Offices of MOEF
by e-mail.
|
|
|
(XXXI)
The project authorities shall inform the
Regional Office as well as the Ministry
regarding the date of financial closure and
final approval of the project by the concerned
authorities and the dates of start of land
development work and commissioning of
plant.
|
|
4.
|
All
other conditions contained in the Ministry's
letter of even no. 18.10.2007 conveying
Environmetal Clearance shall remain
unchanged.
|
|
5.
|
This
issues with approval of Competent
Authority. |
|
|
|
|
|
|
Yours
Faithfully
LALIT
KAPUR
DIRECTOR |