K |
|
1 |
06 of
2006-07
(Open) |
24.05.06 |
Construction/
Rebuilding of
substructure (On open foundation) of Major bridge No. 66, 68, 68A, 68B,
72A, 78 & 78A between Sitamarhi and Dhang stations in connection with the
guage conversion work of Jaynagar-Darbhanga- Narkatiaganj section. |
ECR/CAO/
Con/WT/
311/11814
Dated
12.12.06
|
Hindustan Steelworks
Construction Ltd. Unit: Land Development Bank Building (3rd
Floor), Budh Marg, Patna- 800001.
|
N.A |
5.37 Cr |
N.A |
6.06 Cr |
11.02.08 |
|
2. |
07 of
2006-07
(Open) |
24.05.06 |
Construction/
Rebuilding of substructure
(On open foundation) of Major bridge No. 81, 82, 84, 85 & 91 between Riga
and Bairgania stations in connection with the guage conversion work of
Jaynagar-Darbhanga-Narkatiaganj section.
|
ECR/CAO/
Con/WT/
312/11815
Dated.
12.12.06
|
Hindustan Steelworks Construction Ltd. Unit:
Land Development Bank Building (3rd Floor), Budh Marg,Patna-
800001.
|
N.A |
5.24 Cr |
N.A |
5.91 Cr |
11.02.08 |
|
3 |
83 of
2005-06
(Open) |
29.03.06 |
Miscellaneous Civil Engineering works like earth work,
Construction of Signal building, platform, FOB, approach road, provision
of fencing ,construction of minor bridges, provision of blanketing, works
of level crossings etc., in Danauli - Phulwaria (excl)- Sanaha (incl) )
in connection with doubling of Begusarai- Khagaria section.” |
ECR/CAO/
Con/WT/
288/11905
Dated
18.12.06
|
Dhananjay Construction Pvt. Ltd., East Gandhi Maidan,
Jahanabad
|
N.A. |
4.96 Cr |
N.A. |
5.01 Cr |
17.10.07 |
|
4 |
81 of
2005-06
(Open) |
29.03.06 |
Miscellaneous Civil Engineering works like earth work,
Construction of Signal building, platform, FOB, approach road, provision
of fencing ,construction of minor bridges, provision of blanketing, works
of level crossings ,track linking(manually) and unloading and spreading of
ballast from railway wagons in connection with doubling of Tilrath -
Begusarai section.” |
ECR/CAO/
Con/WT/
286/12123
Dated
27.12.06
|
Binay Kumar Singh,
Kanti
Factory Road, Mahatma Gandhi Nagar, Kankarbagh, Patna – 800020
|
N.A. |
5.32 Cr |
N.A |
5.56 Cr |
26.02.08 |
|
5 |
31 of
2005-06 (Open) |
13.03.07 |
Construction of substructure of Major Bridge No. 88 on River-Kamla between
Lohana Road and Jhanjharpur station of Samastipur Division |
ECR/CAO/
Con/WT/
254/1827
Dated
17.04.07 |
S.R. Ujjain Engicon. At & P.O. Valmikinagar
Distt – Champaran. |
N.A. |
8.66 Cr |
N.A |
8.66 Cr |
16.10.2008 |
|
6 |
29 of
2005-06 (Open) |
13.03. 07 |
Earth
work in formation and construction/rebuilding/jacketing of minor bridges
from Sakari to Ghoghardiha. |
ECR/CAO/
Con/WT/
236/612
Dated
12.02.07 |
S.R. Ujjain Engicon. At & P.O. Valmikinagar
Distt – Champaran. |
N.A. |
10.75 Cr |
N.A. |
10.75 Cr |
11.11.2007 |
|
7 |
38 of
2006-07
(Open) |
04.10.06 |
Supplying, leading and loading into wagons 50mm size machine crushed hard
stone ballast 1,00,000 cum from Pakur quarry in connection with gauge
conversion/Doubling/new BG line work of construction organisation of EC
Rly under CAO/C. Master Sunder Das & Sons has to supply 50% of this
quantity i.e. 50,000 cum. |
ECR/CAO/
Con/WT/
352/Pakur/
Master Sunder
Das
& Sons/
11371
Dated
30.11.2006 |
Master Sunder Das &
Sons, PO & Distt.-Pakur, Jharkhand.
|
N.A. |
1.96 Cr |
N.A. |
1.96 Cr. |
29.11.2007 |
|
8 |
38 of
2006-07
(Open) |
04.10.06 |
Supplying, leading and loading into wagons 50mm size machine crushed hard
stone ballast 1,00,000 cum from Pakur quarry in connection with gauge
conversion/Doubling/new BG line work of construction organisation of EC
Rly under CAO/C. Pakur Quarries Pvt. Ltd has to supply 50% of this
quantity i.e. 50,000 cum. |
ECR/CAO/
Con/WT/
352/Pakur/
Master Sunder
Das
& Sons/
11370
Dated
30.11.2006
|
Pakur Quarries Pvt. Ltd., At-Sindhipara,
Pakur, Jharkhand
|
N.A. |
1.96 Cr |
N.A. |
1.96 Cr. |
29.11.2007 |
|
9 |
18 of
2006-07 |
13.09.06 |
Construction of 150
bedded super Specialty Central Hospital at south side of Patna
Jn.
|
ECR/CAO/
Con/WT/334/
Dated
19.01.2007 |
Hindustan Steelworks
Construction Ltd. Unit: Land Development Bank Building (3rd
Floor),Budh Marg, Patna - 800001. |
N.A. |
17.13 Cr |
N.A. |
17.13 Cr. |
18.04.2009 |
|
10 |
33 of
2006-07 (Open), |
03.01.07 |
Construction of shed, administrative building, striping shop shed, body
building shop, end wall fabrication shop, Machine & Component shop shed,
heavy duty flooring & gantry, path way metalled road and tube well etc. in
connection with facilities for repairs of ‘C’ category unloadable wagons
at Samastipur workshop. |
ECR/CAO/
Con/WT/
687/1362
Dated
30.03.2007 |
Hindustan Steelworks
Construction Ltd. Unit: Land Development Bank Building (3rd
Floor),Budh Marg, Patna - 800001 |
N.A. |
18.24 Cr |
N.A. |
18.24 Cr. |
29.09.2008 |
|
11 |
57 of
2006-07
(Open) |
22.11.06 |
Construction of Guide
bund of bridge no.31 in connection with construction of new line between
Muzaffarpur-Sitamarhi
|
ECR/CAO/
Con/WT/325/
dated.
18.01.07 |
Fulena Construction(P)
Ltd., Shri Krishna Nagar, P.O. & Distt.-Begusarai. |
N.A. |
11.37 Cr |
N.A. |
11.37 Cr. |
17.11.2007 |
|
12 |
15 of
2006-07
(Open) |
04.10.06 |
Construction of Guide
bunds of bridge no.12 and 23 in connection with construction of new line
between Muzaffarpur - Sitamarhi
|
ECR/CAO/
Con/WT/324/
Dated
08.01.2007 |
Phular Construction Co.
(P). Ltd. At +PO-Khbra (near 5 no. Railway Gumti, Manjhowliya,),Adarsh
Nagar, Muzaffarpur. |
N.A. |
08.01 Cr |
N.A. |
08.01Cr. |
07.11.2007 |
|
13 |
72 of
2006-07
(Risk and Cost/Open) |
27.12.06 |
Earthwork in formation, blanketing and Construction of Minor Bridges in
connection with development of New Chhapra Kachhehri Junction and in
connection with provision of rail link from Nayagaon to Wheel Axle Plant
at Dariapur block |
ECR/CAO/
Con/WT/
241/552
dated
08.02.2007 |
S.R.
Construction. Pvt. Ltd.,
Audhopur, Rewa,
Distt- Muzaffarpur
|
N.A. |
04.94 Cr |
N.A. |
04.94Cr. |
07.08.2007 |
|
14 |
99 of
2005-06
(Risk and Cost/Open) |
07.06.06 |
Earthwork in cutting filling, Compaction, turfing, construction of minor
bridges and other associated works between Koderma and Hazaribagh in
connection with construction of a new B.G. Rail line between Koderma and
Ranchi(Reach-V, Chainage km 21.5 to km 27.00) |
DCE/Con/
Agt /02/06-07
dated
31.08.2006. |
Saurabh Kumar and Bros.
|
N.A. |
04.94 Cr |
N.A. |
04.94Cr. |
08.08.2008 |
|
15 |
41 of
2005-06
(Open) |
05.04.06 |
Construction/extension of platform, FOB, construction of relay room,
battery room, Generator room and equipment room, making level crossing as
per provision in IRPWM and other miscellaneous works between Narkatiaganj
and Bhikhnathori stations (excl Narkatiaganj and including Bhikhnathori)
in connection with the gauge conversion of JYG-DBG-NKE section. |
Dy CE/Con
/II/PNBE
/15
dated
15.11.06 |
Prashant Kumar
Jha Behind Sanjay Cinema PO- M. I. T., Brahmpura
Distt- Muzaffarpur
|
NIL |
1.22
Cr |
NIL |
1.22Cr. |
03.10.2007 |
|
16 |
25 of
06-07
(Open) |
07.12.05 |
Construction/ Extension of platform, FOB, construction of relay room,
Battery room, Generator room and equipment room, making level crossing as
per provision in IRPWM and other miscellaneous works between Sitamarhi and
Chhaura Dano sattions (excl Sitamarhi and including Chhaura Dano) in
connection with gauge conversion work of Jaynagar - Darbhanga-
Narkatiaganj section. |
W/CON/
815/II/
Patna/
OT-25/
2005-06/
Date:
29.5.2006 |
Chanakya
Technos Private Ltd. 34 A. N. Path, North S. K. Puri Boring Road
Patna
|
NIL |
1.94 Cr |
NIL |
1.94Cr. |
30.06.2007 |
|
17 |
5/II/SPJ/
04-05
(open)
(1)
|
16.03.05 |
Construction of station buildings, platform, S&T Complex, Circulating
area, approach road and miscellaneous works such as sinking hand pump,
provision of fencing, benches, provision of station name boards etc at
Sakari, Jagdishpur, Benipur, Neuri and Biraul stations in connection with
Sakari- Hasanpur Road New rail Line Construction project. |
Dy CE/Con/II
/PNBE/13
dated
20.10.06 |
M/S Mukund Kumar Singh &
Co., At & PO- Ramdiri, Distt- Begusarai |
NIL |
1.60 Cr |
NIL |
1.60Cr. |
27.03.2007 |
|
18 |
02 OF
06-07 (OPEN)
|
21.06.06 |
Fabrication, supply and fixing of galvnised steel channel sleepers on
girders and left over work of bridges between Jaynagar - Darbhanga
stations in connection with the gauge conversion of
Jaynagar-Darbhanga-Narkatiaganj section. |
Dy CE/Con/
II/PNBE/21
dated
28.12.06 |
Shree Bihariji
Engineering Corporation, 18, Mallick Street, 2nd Floor, Kolkata- 700007 |
NIL |
1.54 Cr |
NIL |
1.54Cr. |
17.04.2007 |
|
19 |
05 OF
06-07 (OPEN)
|
21.06.06 |
Linking BG track manually , carting and stacking released materials,
linking level crossing, spreading of ballast, unloading 52kg Rails,
spreading of PSC sleepers , linking & packing of BG points and crossing
etc. between Sakari (Excl)-Biraul (Incl) stations in connection with
construction of new line of Sakari-Hasanpur section. |
DCE/C/I/DBG
/Agt/2006-07
/04
dated
28.02.2007 |
Chanakya Technos
Pvt.Ltd., 34, A. N. Path, North S. K. Puri, Boring Road, Patna-13 |
NIL |
1.86 Cr |
NIL |
1.86Cr. |
14.08.2007 |
|
20 |
06 OF
06-07 (OPEN)
|
21.06.06 |
Linking BG track manually including dismantling MG track, carting and
stacking released materials, linking level crossing, spreading of ballast,
unloading 52kg Rails, spreading of PSC sleepers, linking & packing of BG
points and crossing etc between Jaynagar (Incl)- Madhubani (Incl)
stations in connection with Gauge conversion of Jaynagar-Darbhanga-
Narkatiaganj section. |
Dy CE/Con/II
/PNBE/11
dated
18.10. 2006 |
M/S J. S. Company, At &
PO- Bihat, Distt- Begusarai, (Bihar) |
NIL |
1.81 Cr |
NIL |
1.81Cr. |
05.06.2007 |
|
21 |
07
OF 06-07 (OPEN) |
21.6.06 |
Linking BG track manually including dismantling MG track, carting and
stacking released materials, linking level crossing, spreading of ballast,
unloading 52kg Rails, spreading of PSC sleepers ,linking & packing of BG
points and crossing etc between Madhubani( Excl)-Darbhanga (Incl)
stations in connection with Gauge conversion of
Jaynagar-Darbhanga-Narkatiaganj section. |
Dy CE/Con/II
/PNBE/10
dated
11.9.06 |
Surendra prasad Paras
Nagar, Bagaha, West Champaran (Bihar) |
NIL |
2.05 Cr |
NIL |
2.05Cr. |
06.5.2007 |
|
22 |
09 OF
06-07 (OPEN) |
26.7.06 |
Miscellaneous Civil Engineering works i.e. FOBs, PP shelter and left over
works at stations, level crossing works like providing and commissioning
of lifting barrier between Jayanagar-Darbhanga stations and Sakari -
Biraul stations in connection with the gauge conversion work of Jaynagar
-Darbhanga- Narkatiaganj section and new line of Sakari-Hasanpur section. |
Dy CE/Con/II
/PNBE/17
dated
01.12.2006 |
M/S Samiur Rahman Khan,
New Colony, Dharampur, Samastipur-848101 |
NIL |
2.13 Cr |
NIL |
2.13 Cr. |
25.6.2007 |
|
23 |
10 OF
06-07 (OPEN) |
09.8.06 |
Supplying, fabrication and erection of welded / riveted steel plate
girders / composite steel plate girders for the section Jaynagar –
Darbhanga - Sitamarhi in connection with the gauge conversion of Jaynagar
– Darbhanga - Narkatiaganj section. |
W/CON/815
/II/Patna/
OT-10/
2006-07/
Date:
28.12.2006 |
Rawatsons Engineers (P)
Ltd., 5 K Stephen Court, 18 A-Park Street, Kolkata- 700071 |
NIL |
2.62 Cr |
NIL |
2.62 Cr. |
27.6.07 |
|
24 |
12 OF
06-07 (OPEN) |
01.9.06 |
Supplying and providing of granular materials/sand, spreading in layers of
thickness approved by Engineer-in-charge in loose state, watering/drying
and compacting the same with contractor's heavy duty power driven
vibratory roller of 10-12 tonnes capacity, to provide 300mm thick layer
between Sakari-Benipur stations in connection with the construction of new
line between Sakari-Hasanpur. |
DCE/C/I/DBG
/Agt/
06-07/01
dated
10.02.07 |
Rajeshwar Singh, Azad
Colony, Road No. 4,Maripur, Muzaffarpur |
NIL |
1.93 Cr |
NIL |
1.93 Cr. |
01.5.07 |
|
25 |
13 OF
06-07 (OPEN) |
01.9.06 |
Supplying and providing of granular materials/sand, spreading in layers of
thickness approved by Engineer-in-charge in loose state, watering/drying
and compacting the same with contractor's heavy duty power driven
vibratory roller of 10-12 tonnes capacity, to provide 300mm thick layer
between Benipur - Biraul stations in connection with the construction of
new line between Sakari-Hasanpur. |
W/CON/815 /II/
Patna/OT-13/
2006-07/
Date:
02.11.2006 |
Rajeshwar Singh, Azad
Colony, Road No. 4,Maripur, Muzaffarpur |
NIL |
1.60 Cr |
NIL |
1.60 Cr. |
01.5.07 |
|
26 |
14 OF
06-07 (OPEN) |
18.10.06 |
Unloading, carting, spreading and compaction of quarry dust blanketing
materials in layers of thickness approved by Engineer-in-charge in loose
state, watering/drying the same with contractor's heavy duty power driven
vibratory roller of 10-12 tones capacity, to provide 300mm thick layer
between Jaynagar-Darbhanga & Darbhanga-Sitamarhi stations in connection
with the gauge conversion of Jaynagar-Darbhanga-Narkatiaganj section. |
Dy CE/Con/II
/PNBE/23
dated
04.02.07 |
Surendra Prasad, Paras
Nagar, Bagaha, West Champaran |
NIL |
1.63 Cr |
NIL |
1.63 Cr. |
19.8.07 |
|
27 |
31 OF
05-06 (OPEN) |
25.01.06 |
Earth
work in filling in embankment/ existing embankment i.e. raising/widening,
trolley refuses, level crossing, platform etc. with all classification of
approved soil and mechanical compaction in layers between Harnagar –
Kusheshwarsthan (24.00-28.00) station in connection with the construction
of new line between Sakari-Hasanpur |
DCE/C/I/DBG
/Agt/2006-
07/02
dated
10.02.07 |
Gita Prasad Singh & Co.
(P) Ltd.
Kalambag Road
PO- Ramna
Muzaffarpur |
NIL |
1.34 Cr |
NIL |
1.34 Cr. |
30.6.2007 |
|
28 |
32 OF 05-06 (OPEN) |
25.01.06 |
Earth
work in filling in embankment/ existing embankment i.e. raising/widening,
trolley refuses, level crossing, platform etc. with all classification of
approved soil and mechanical compaction in layers between Neuri-Harnagar
station in connection with the construction of new line between
Sakari-Hasanpur |
Dy CE/Con
/II/
PNBE/06
dated
04.7.06 |
M/S Ganga Construction
Co. Just East Deepshikha
Bishwa Nath Nagar
Begusarai
(Bihar) |
NIL |
1.69 Cr |
NIL |
1.69 Cr. |
30.6.2007 |
|
29 |
33 OF 05-06 (OPEN) |
25.01.06 |
Earth
work in filling in embankment/ existing embankment i.e. raising/widening,
trolley refuses, level crossing, platform etc. with all classification of
approved soil and mechanical compaction in layers between Sakari –Neuri
station in connection with the construction of new line between
Sakari-Hasanpur |
Dy CE/Con
/II/PNBE
/04
dated
31.5.2006 |
M/S Yogendra Rai,
Village- Bansi Batrahan, P.O. - Mishra Batrahan, Distt- Gopalganj, (Bihar) |
NIL |
1.25 Cr |
NIL |
1.25 Cr. |
30.6.2007 |
|
30 |
34 OF 05-06 (OPEN) |
25.01.06 |
Earthwork in filling in embankment/exisitng embankment i.e.
raising/widening, trolley refuses, level crossings, platform etc. with all
classification of approved soil and mechanical compaction in layers
between Harnagar-Kusheswarsthan(28.00-32.00) stations in connection with
the construction of new line between Sakari-Hasanpur. |
DCE/C/I /
DBG/Agt
/2006-07
/03 dated
15.02.2007 |
Fulena Construction (P)
Ltd, Shrikrishna Nagar, Power house Distt-Begusarai |
NIL |
1.30 Cr |
NIL |
1.30 Cr. |
30.6.2007 |
|
31 |
53 of 05-06/95 of 05-06 |
07.06.06 |
Construction of minor bridges between Km 30 to 35.60 and in Tilaiya yard. |
ECR/CAO
/Con/WT/
06-07/27
dated 03.11.2006 |
M/s Surya Builders,
Bagaha Narainpur West, Champaram. |
N.A. |
2.73 Cr |
N.A. |
2.73 Cr. |
22.02.2008 |
|
32 |
3 of
06-07/
5 of
06-07 |
27.09.06 |
Construction of
Sub-structure of bridge No. 47 above pile
|
DCE/Con
/RGD/
WT/43
dated
22.11.2006 |
Foundation Engineers,
509 Adharshila Complex, Patna. |
N.A. |
1.70
Cr |
N.A. |
1.70 Cr. |
28.02.2007 |
|
33 |
4 of
06-07/
4 of
06-07 |
27.09.06 |
Construction of Minor Bridges between km 26.100 to 27.00 |
DCE/Con
/RGD/
WT/48
dated
01.12.2006 |
Ramakant Singh 101 Lotus
Apartment, New Patliputra Colony, Patna – 16. |
N.A. |
2.57 Cr |
N.A. |
2.57 Cr. |
31.03.2007 |