Sl
No. |
Tender
No. |
Date
of opening |
Description
of item/ work |
Contract
No.
and date |
Contractor’s
Name |
Quantity
(for supply contract) |
Estimated
cost (forEngg/
Elect/
S&T/Mech)
Rs. |
Rate
(for supply contract) Tendred cost (for Engg/Elect/
S&T/Mech) |
Value
of contract Rs. |
Scheduled
completion date |
|
A |
B |
C |
D |
E |
F |
G |
H |
I |
J |
K |
|
1 |
02 of 2007-08 (Open) |
31.01.07 |
Construction
of maintenance shed with 2 nos. pit and gantry, covered shed
for wheel, store yard building, providing concrete apron,
D.G. set building with staff room and switch room in connection
with augmentation of holding capacity of diesel shed from
50 to 100 locos at Samastipur |
ECR/CAO/Con/WT/79
Dated 03.07.07. |
Hindustan Steelworks Construction Ltd.
Unit: Land Development Bank Building
(3rd Floor), Budh Marg,
Patna- 800001. |
N.A |
03.48 Cr |
N.A. |
04.10 Cr |
02.10.2008 |
|
2. |
99 of
2006-07 (Open) |
14.03.07 |
Construction
of pile foundations of rail approach viaduct 55x21.75m + 6x12.5m(south
end) and 5x21.7m + 6x12.5m(north end) in connection with rail
cum road bridge at
Munger. |
ECR/CAO/Con/WT/327/3559
Dated.04.06.07
|
Allied Infrastructures
& Projects Pvt Ltd.
2nd and 3rd
floor,
P-16, Bentik Street,
A.C. Mansion,
Kolkata-700001.
|
N.A |
17.65 Cr |
N.A |
19.81 Cr |
03.12.2008 |
|
3 |
13 of
2007-08 (Single Tender) |
26.04.07 |
Unloading
track ballast from all types of BG wagons at Garhara and leading
and stacking in BG ballast depot at Garhara yard, loading
in BG wagons and unloading in block section/Station yard between
Samastipur to Khagaria in connection with gauge conversion
work at samastipur- Mansi via Khagaria section |
ECR/CAO/Con/WT/Single/443
dated 16.05.07. |
M/s Chandrashekhar Singh
& Co.,
At & P.O: Bihat,
Dist: Begusarai.
|
N.A |
02.48 Cr |
N.A |
02.60 Cr |
05.11.2007 |
|
4 |
01 of
2007-08(open) |
09.05.07 |
Construction/Strengthening of 05 Nos. major bridges between
Dauram Madhepura- Murliganj stations in connection with gauge
conversion work of Saharsa-Purnea. |
ECR/CAO/Con/WT/444/4248
dated 11.07.07. |
GPT Infrastructures Private Ltd.
Jeewan Satya, D.D.- 6, Sector- 1.
Salt Lake City, Kolkata,
West Bengal - 700064.
|
N.A. |
06.76 Cr |
N.A |
08.01 Cr |
10.04.08 |
|
5 |
140 of
2006-07 (Open) |
09.05.07 |
Construction
of 6 Nos. major bridges between Saharsa-Dauram Madhepura stations
in connection with gauge conversion work of Saharsa-Purnia
section. |
ECR/CAO/Con/WT/368/
4249 dated 11.07.07. |
GPT Infrastructures Private Ltd.
Jeewan Satya, D.D.- 6, Sector- 1.
Salt Lake City, Kolkata,
West Bengal - 700064.
|
N.A. |
13.07 Cr |
N.A |
15.48 Cr |
10.04.08 |
|
6 |
47 of
2006-07 (Open) |
07.02.07 |
Earth
work in cutting, filling, compaction, blanketing, turfing,
construction of minor bridges and other associated works between
Hazaribagh and Barkakana in connection with construction of
a new B.G. Rail line from Koderma to Ranchi for the Reach-XXXI
(Ch. Km. 123.000 to Km. 138.000 |
ECR/CAO/Con/WT/365/
4593 dated 31.07.07 |
Hindustan Steelworks Construction Ltd.
HSCL Adm.
Building, Bokaro Steel City-827001
|
N.A |
15.30 Cr |
N.A. |
17.89 Cr |
30.07.09 |
|
7. |
46 of
2006-07 (Open) |
07.02.07 |
Earth
work in cutting, filling, compaction, blanketing, turfing,
construction of minor bridges and other associated works between
Hazaribagh and Barkakana in connection with construction of
a new B.G. Rail line from Koderma to Ranchi for the Reach-XXX
(Ch. Km. 119.300 to Km. 123.000). |
ECR/CAO/Con/WT/364/
3286 dated 24.05.07 |
Hindustan Steelworks Construction Ltd.
HSCL Adm.
Building, Bokaro Steel City-827001
|
N.A |
15.53 Cr |
N.A. |
17.89 Cr |
23.05.09 |
|
8. |
58 of
2006-07 (Open) |
07.02.07 |
Earth
work in cutting, filling, compaction, blanketing, turfing,
construction of minor bridges and other associated works (Reach-I
Km. 0.000 to Km. 10.000) between Hazaribagh and Shivpur in
connection with construction of a new B.G. Rail line. |
ECR/CAO/Con/WT/374/ 3757
dated 12.06.07 |
Deepika Construction,
8-2-686/C/D/5,
Road No. 12,
Banjara Hill,
Hyderabad-500034
|
N.A |
8.30 Cr |
N.A. |
9.53 Cr |
11.12.08 |
|
9. |
48 of
2006-07 (Open) |
07.02.07 |
Construction
of 6x5m span RCC box bridge (at Km.119.255) in connection
with construction of new B.G. Railway line between Hazaribagh
and Barkakana. |
ECR/CAO/Con/WT/366/
3634 dated 08.06.07 |
Hindustan Steelworks Construction Ltd.
Unit: Land Development Bank Building
(3rd Floor), Budh Marg,
Patna- 800001.
|
N.A |
17.58 Cr |
N.A. |
18.85 Cr |
07.12.08 |
|
10 |
126 of
06-07 (Open) |
11.04.07 |
Supplying,
leading & loading of 150000 cum of 50mm size machine crushed
ballast from Quarry of Pakur to any type to Rly wagon under
CAO/Con, ECR |
ECR/CAO/Con/WT/434/3645/
JBC dated 07.06.07
|
Jai Bharat
Construction |
50000 cum |
1.96 Cr. |
392/-CUM |
20199760/ |
6.03.2008 |
|
11 |
126 of
06-07 (Open) |
11.04.07 |
Supplying,
leading & loading of 150000 cum of 50mm size machine crushed
ballast from Quarry of Pakur to any type to Rly wagon under
CAO/Con, ECR |
ECR/CAO/Con/WT/434/3645/
HIMC dated 07.06.07
|
Hindustan Industries
& Mining Corporation |
50000 cum |
1.96 Cr. |
392/-CUM |
20199760/ |
6.03.2008 |
|
12 |
126 of
06-07 (Open) |
11.04.07 |
Supplying,
leading & loading of 150000 cum of 50mm size machine crushed
ballast from Quarry of Pakur to any type to Rly wagon under
CAO/Con, ECR |
ECR/CAO/Con/WT/434/3645/
PA dated 07.06.07
|
M/s Parmanand Adwani |
50000 cum |
1.96 Cr. |
392/-CUM |
20199760/ |
6.03.2008 |