Sl
No. |
Tender
No. |
Date
of opening |
Description
of item/ work |
Contract
No.
and date |
Contractor’s
Name |
Quantity
(for supply contract) |
Estimated cost (forEngg/
Elect/
S&T/Mech)
Rs. |
Rate
(for supply contract) Tendred cost (for Engg/Elect/
S&T/Mech) |
Value
of contract Rs. |
Scheduled
completion date |
| A |
B |
C |
D |
E |
F |
G |
H |
I |
J |
K |
|
1 |
112
of 2007-08 (Open short period) Risk & Cost |
10.10.07 |
Risk
& Cost for the work of “Construction of major bridge no-30
(1x12.2m) Ch-20.950 Km, Bridge no-31 (1x12.2m) Ch-21.345 Km,
ROB at Ch 25.243 Km and RUB at Ch-25.640 Km in connection
with construction of new B.G.line between Rajgir-Tilaiya.” |
ECR/CAO/Con/WT/533/Dated
05.11.2007 |
Hindustan Steelworks
Construction Ltd. Unit Land Development
Bank Building (3rdFloor), Budh Marg,
Patna-800001 |
N.A |
7.09 Cr |
N.A. |
7.4 Cr |
04.07.2008 |
| 2. |
105
of 2007-08 (Open short period) Risk & Cost |
26.09.07 |
Balance
work of Earthwork in connection with construction of
new BG line between Grahani-Ara (Km. 19.2 to 0.00) in connection
with new BG line between Ara-Sasaram |
ECR/CAO/Con/WT/527
Dated 05.11.2007 |
M/s Uttar Bihar Construction
Co., Sports Club Road, Chhatauni,
Motihari, Distt.-East
Champaran |
N.A |
4.78 Cr |
N.A |
3.66 Cr |
04.04.2008 |
| 3 |
Tender No. 05 of 2007-08 (Open) |
09.05.07 |
Construction
of pile/well foundation, substructure and protection work
of Major Bridge No. 3 at km 3.390 and Bridge No.18 at km 11.900
between Khagaria–Kusheshwar Asthan in connection with construction
of new line between Khagaria- Kusheshwer Asthan.” |
ECR/CAO/Con/WT/403/6276
Dated 24.10.07 |
S.P
Malik & Co. Pvt. Ltd., 4B,
34A, Metcalf Street, Kolkata-700013 |
N.A |
13.73 Cr.
|
N.A |
17.22 Cr. |
22.04.2009 |
| 4 |
03 of 2007-08 (Open) |
16.05.07 |
Construction
of washing pit, stabling line, Integrated sick line, shed
offices & administrative building and other ancillary
works for coaching complex facility at Saharsa Station. |
ECR/CAO/Con/WT/427/5377 Dated
10.09.2007
|
M/s Ganga Construction Co.,
At- Just East of Deepshika Cinema,
Ist lane, Vishwanath Nagar, Begusarai, P.O. & Dist-
Begusarai, Bihar,
PIN- 851101.
|
N.A |
3.93
Cr. |
N.A |
4.33
Cr. |
09.08.2008 |
| 5 |
49 of
07-08
(open)Risk & Cost
|
08.08.07 |
Earthworkm,
in cutting, filling, compction, turfing, blanketing, construction
of minor bridges and other associated work between Koderma-Hazaribagh
in connection with construction of new BG rail line from Koderma
to Ranchi (Reach 7 Ch. 35.50 Km. to 43.50 |
ECR/CAO/Con/WT/464/6059
dated 08.10.07 |
Millith
Karv Engg & Trading , 38, L.G.F New I, N.R.I. Complex,
Great Kailash-IV, New Delhi-1100019. |
N.A. |
4.58
Cr |
N.A |
5.96
Cr |
07.04.2009 |
| 6 |
50
of
07-08
(open)Risk & Cost
|
08.08.07 |
Construction
of 10.4m span ROBs at Km. 2.134, 6.718, 7.540, 13.910, 24.950,
26.654,31.032,36,740,38.727, 44.777,45.331,47.496,51.724,
69.250,73.120 etc. ) with RCC abutment slab with open or pile
foundation and balance minor bridges/RUB Km. 0.35 btween Koderma
to Ranchi. |
ECR/CAO/CON/WT/465/6125 dt. 15.10.07 |
Jaishiv
Construction Pvt. Ltd., Bano Manzil Road(Near Phari Mabir)
Ranchi. |
N.A |
12.77
Cr |
N.A. |
18.64
Cr |
14.10.2009 |
| 7 |
65
of 07-08
(open)
|
22.08.07 |
Earthwork
in cutting, filling, compaction, turfing blanketing,minor
bridges including RUB’s etc. and other associated works in
connection with construction of a new BG Rail line of Koderma-Giridih
section(Reach-VIII Ch. 87.00 km to 94.50 km.) |
ECR/CAO/Con/WT/480 dt. 30.10.07 |
Neo Built
Corporation Pvt. Ltd.46C , Chowering Road, Kolkata 700001 |
N.A |
8.92
Cr |
N.A
|
10.78
Cr |
29.04.2009. |
| 8 |
121 of
2006-07 (open/Risk & Cost.)
|
16.05.07 |
Earth
work in cutting, filling, compaction, blanketing turfing,
construction of minor bridges and other associated works between
Koderma to Hazaribagh in connection with construction of a
new B.G Rail line from Koderma to Ranchi. (Reach-VIII, Ch.
Km. 43.5 to 47.50) |
ECR/CAO/Con/WT/429
dated 07.09.07 |
Deepika
Construction, 8-2-686/C/D/5, Road No. 12, Banjara Hill, Hyderabad-500034 |
N.A |
4.09
Cr |
N.A |
5.37
Cr |
06.09.2009 |
| 9 |
124 of 06-07 (open/Risk & Cost.) |
16.05.07 |
Earth
work in cutting, filling, compaction, blanketing ,turfing,
construction of minor bridges and other associated works between
Koderma to Hazaribagh in connection with construction of a
new B.G Rail line from Koderma to Ranchi. (Reach-X, Ch. Km.51.50
to 56.50) |
ECR/CAO/Con/WT/432
dated 07.09.07 |
B.K.B.Transport (P) Ltd, New Road,
P.O.Phusro Bazar, Bokaro-829144, Jharkand |
N.A |
5.45Cr |
N.A |
7.95
Cr |
06.09.2009 |
| 10 |
125 of
06-07 (open/Risk & Cost.) |
16.05.07 |
Earth
work in cutting, filling, compaction, blanketing turfing,
construction of minor bridges and other associated works between
Koderma to Hazaribagh in connection with construction of a
new B.G Rail line from Koderma to Ranchi. (Reach-XV, Ch. Km.
66.00 to 69.10) |
ECR/CAO/Con/WT/433
dated 07.0907 |
Deepika
Construction, 8-2-686/C/D/5,
Road No. 12, Banjara Hill, Hyderabad-500034 |
N.A |
6.59 |
N.A |
7.71
Cr |
06.09.2009 |
| 11 |
54 of
06-07 (Open) Tender in Two Packet
System |
21.08.07 |
Risk
and cost tender for earthwork in north embankment (Sonepur
End), blanketing, construction of minor bridge no. 8, 9, 10,
11, 13 & 14 in connection with construction of Railway
bridge across river Ganga and connecting Railway line on Patna
and Sonepur |
ECR/CAO/CON/WT/361/6007
dt. 08.10.07 |
Modi Projects Pvt Ltd. Kanke
Road, Ranchi-834008
|
N.A |
14.54
Cr |
N.A |
21.33
Cr |
7.06.2009 |
| 12 |
94 of
06-07 (Risk & Cost/ Open) |
07.03.07 |
Earth
work from railway and private land in filling for new embankment,
yards, trolley refuses and level crossings, provision of blanketing
and construction of Minor Bridges (Bridge Nos. 15 to 23, 25,
to 28) from Km. 13.00 to Kusheshwarsthan (excl) in connection
with Sakri- Hasanpur Road new line construction projects |
ECR/CAO/CON/WT/361/6007
dt. 08.10.07 |
Dharam Nath Construction Pvt.
Ltd, Industrial
Area, Jhanjharpur, P.O. Jhanjharpur, District- Madhubani.
|
N.A |
3.32
Cr |
N.A |
4.14
Cr |