Open
Tender Notice No.:- 03/2008-09
|
Sealed Open Tenders are invited for the under-mentioned work:- |
|
|
| Sl.
No. |
Description of work
|
Approx
cost (Rs)
|
Earnest
Money (Rs) |
Cost
of Tender Form (Rs) |
Completion
Period |
|
Sr.
DEN/2/HWH |
| 1. |
Extracting/resinking
of hand pump in different stations and regular maintenance
of H/tubewell (for 2 years) in the jurisdiction of SSE/W/SKG
under Sr. DEN/2/HWH.
|
25,92,532/- |
51,860/- |
3,000/- |
24
(twenty four) months from date of acceptance |
| 2. |
Sinking
one deep tube-bell 200 x 350 mm dia at Ambagan Colony, Burdwan
under AEN/BWN.
|
8,62,615/- |
17,260/- |
2,000/- |
02
(two) months from date of acceptance. |
|
Sr.
DEN/4/HWH |
| 3. |
Extension
of barrel length with RCC jacketing of arch of Bridge no.
177 between Nalhati and Chatra under AEN/RPH.
|
45,76,513/- |
91,540/- |
3,000/- |
04
(four) months from date of acceptance. |
| 4. |
Assisting
BCM for Deep screening works and other ancillary works
between NHT-AZ branch line under AEN/AZ.
|
20,28,500/- |
40,570/- |
3,000/- |
11
(eleven) months from date of acceptance |
| 5. |
Through
renewal of old damaged pipe line connection cum sanitary fittings
under AEN/AZ.
|
22,55,518/- |
45,120/- |
3,000/- |
04
(four) months from date of acceptance |
| 6. |
Manufacturing,
fabrication 52 kg/60 kg IN SITU Glued insulated joints under
Sr. DEN/4/HWH
|
56,10,616/- |
1,12,220/- |
5,000/- |
09
(nine) months from date of acceptance. |
|
DEN/Arbn/HWH |
| **7. |
Horticulture
Zone – Zone No. 4 (General) under AEN/W/HWH P.E 30.06.09 (jurisdiction
– rail Museum, River side garden. Civil Engineering and Horticulture
works) which includes (1) New works addition and alteration
to existing structure, special repair works and supply of
building materials subject to contract value of each such
work not exceeding Rs. 2.00 Lakhs (Two lakhs) (2) All ordinary
repairs and maintenance works and (3) Conveyance of materials
e.g. bricks, lime, sand etc. which are likely to be required
in a zone during the year.
|
15,00,000/- |
30,000/- |
2,000/- |
PE
30.06.09. |
| 8. |
Cleaning and Desluding
Drain/Waterway
(covered/open) and sumps in the jurisdiction of SSE/W/HWH-1
under AEN/W/HWH.
|
5,91,635/- |
11,840/- |
2,000/- |
06(six)
months from date of acceptance |
|
DEN/Br./HWH |
| 9. |
Supplying,
loading & unloading of quarry stone dust in HWH Divn.
|
20,68,920/- |
41,380/- |
3,000/- |
06(six)
months from date of acceptance |
|
|
|
N. B. |
i) |
If
any plan /drawing is supplied /attached with Tender
Form, Rs. 200/- per plan/ drawing will be levied
extra.
|
| |
ii) |
If
any Tender Form is to be sent by Regd. Post, additional
Postal Expenses @ Rs. 500/- per Tender Form will
be charged.
|
| 1. |
All tender forms are available for sale
in the office of Sr. Divisional Engineer (Co-ordn.)/Howrah
on production of money receipt for the cost of tender
form (non-refundable) deposited with Chief Cashier/Eastern
Railway, Kolkata or any of the Goods Shed Superintendent
of Howrah & Sealdah Division or Booking Supervisor
– Howrah at Howrah station from 12.00 to 16.00 hrs
on any working day between 15.05.08 to 29.05.08
(except holiday). The sale of tender form
will be closed at 16.00 hrs on 29.05.08. The tender
document will be received on 30.05.08 up to 14.00
hrs. and the same will be opened at 14.30 hrs.
on the same date. If the office is closed on the stipulated
date & time due to some unaccounted holiday or bandh
etc, the tender papers will be received and opened on
the next working day at the same time.
|
| 2 |
Eligibility criteria and all other information
are available in the tender document.
|
| 3. |
The
tender documents will also be available on Website
www.tendertimes.com.
The same can be downloaded and used as tender documents
for submitting the offer. This facility is available
free of cost. However, the Demand Draft (drawn in f/o
FA & CAO/E. Rly/Kolkata) towards the cost of tender
document as prescribed above will have to be enclosed
along with the tender document while submitting the
same. In case the offer is not accompanied with the
valid demand draft for the cost of the tender document
as detailed above, the tender will be summarily rejected.
|
| 4.
|
Eligibility
Criteria :-
|
| |
(A)
For works costing up to Rs.10 lakhs. :- Please sec the
Tender document.
|
|
|
(B)
Works amounting above Rs. 10 lakhs. :-
|
| |
| 1. |
Tenderer
should have completed in the last three financial
years (i.e., current year and three previous financial
years) |
At
least one similar single work for a minimum value
of 35% of advertised Tender value of work. |
| 2. |
Total
contract amount received during the last three
financial years i.e. current year and three previous
financial years. |
Should
be a minimum of 150% of Advertised Tender value.
Tender Committee would satisfy themselves about
the authenticity of the certificate produced by
the tenderer(s) to this effect which may be an
attested certificate from the employer/client,
audited balance sheet duly certified by the chartered
Accountant etc. |
|
|
|
|
| (5) |
Following documents should be submitted
along with the tender
:-
|
| a) |
List of personnel, organisation available
on hand & proposed to be engaged for the subject work.
|
| b) |
List of Plant & machinery available on hand
(own) & proposed to be inducted (own & hired) to be given
separately for the subject work.
|
| c) |
List of Works completed in the last three
financial years giving description of work, organisation
for whom
executed, approximate value of contract at
the time of award, date of award & date of schedule
completion
of work. Date of actual start, actual
completion & final value of contract should also be given.
|
| d) |
List of works on hand indicating
description of work, contract value and approximate value
of balance work
yet to be done and date of award.
|
| Note
:-
|
|
|
1. |
In
case of items (c) & (d) above supportive
documents/certificates from the organisations
whom they worked/are working should be enclosed.
|
|
|
2. |
Certificate from
private individuals for whom such works are
executed/ being executed will not be accepted
|
|
|
3. |
In case of getting
‘identical rate’ by two or more contractors
for one tender the offer of the tenderer who
has received more total contract amount during
last 03 financial years and current financial
year will be considered.
|
|
**This is applicable for Item
No. 7
|
**4. |
If penalty has been imposed on the tenderer
in any ‘work order’ of any Zonal Contract in
Howrah Division during the last three (03) years,
then the tenderer will not be considered for
this Zonal work. |
|
|
|
|
For
Divisional Railway Manager,
|
|
|
E.
Rly,/Howrah
|
|
*Tender