Open
Tender Notice No.:- 12/2008-09
|
Sealed Open Tenders are invited for the
under-mentioned work:- |
|
|
| Sl.
No. |
Description of work |
Approx
cost (Rs)
|
Earnest
Money (Rs) |
Cost
of Tender Form (Rs) |
Completion
Period |
|
Sr.
DEN/1/HWH |
|
1.
|
Work for (i) E. Rly –
Railway protection Force bomb detection & dispersal Squad
and dog kennel for Howrah station and (ii) Repairs to buffer
at TKPR Coaching Complex, Jheel siding, EMU Carshed etc. and
other yards in the jurisdiction of AEN/Works/Howrah.
|
16,99,514/-
|
34,000/-
|
2,000/-
|
06(six)
months from date of acceptance
|
|
2.
|
Provision of drinking water at HWH Electric Loco
Shed and Trip Loco Shed with underground Reservoir, OH Tank,
Pipe line and pumping arrangement and repairs & changing
of damaged ‘AUDCO’ Valves in Sorting Yard/TKPR and
relieving arch bridge by PSC/RCC Slab of Bridge no.4 [1x4’
Arch] under SSE(W)/BMG
in the Section of AEN[W]/HWH.
|
7,28,940/-
|
14,580/-
|
2,000/-
|
04(four)
months from date of acceptance
|
|
3.
|
Re-sinking of deep
tube-well in replacement of the existing deep tube-well at
Rishra under AEN/1/LLH.
|
7,10,285/-
|
14,210/-
|
2,000/-
|
02(two)
months from date of acceptance
|
|
4.
|
PRS facilities at
Serampore under the jurisdiction of AEN/1/LLH.
|
16,71,270/-
|
33,430/-
|
2,000/- |
04(four)
months from date of acceptance
|
|
5.
|
Works for (i) Repairing
of road towards RPF barrack at BMG under SSE/W/BMG and (ii)
Renovation of BMG Health Unit in the section of SSE/W/BMG
under AEN/W/HWH.
|
16,22,814/-
|
32,460/-
|
2,000/-
|
04(four)
months from date of acceptance
|
|
6.
|
Operation of valve in
SYAE under AEN/W/HWH.
|
8,14,680/-
|
16,300/-
|
2,000/-
|
02(two)
months from date of acceptance
|
|
7.
|
Development of Sports
Complex at Howrah under AEN/W/HWH.
|
69,79,678/-
|
1,39,600/-
|
5,000/-
|
07(seven)
months from date of acceptance
|
|
DEN/Arbn/HWH |
|
8.
|
SSM(D)/HWH Depot: Hardenite flooring and
palletisation of main building.
|
10,50,171/-
|
21,010/-
|
2,000/-
|
04(four)
months from date of acceptance.
|
|
9.
|
Work for (i) Repairs to
existing boundary wall in between engine line and line no. 1
in between line no. 41 and S.E.Rly. DN main line at TKPR
Coaching complex under AEN/W/HWH (ii) Repairs
to existing Kutcha road by concrete road from Main gate of
TKPR coaching complex to Dhobighat pump house under AEN/W/HWH,
(iii) Strengthening of coliumn (west side of 37 TK) of
RAJDHANI maintenance shed at TKPR coaching complex.
|
33,30,027/-
|
66,610/-
|
3,000/-
|
04(four)
months from date of acceptance.
|
|
10.
|
Work for (i) Removal of
earth heaps etc. and cutting / cleaning of jungles in the
Howrah yard and other various yard under Sr. DEN(1)/Howrah and
(ii) Repairing of leaky roof of GRP mess and barrack at Tindel
Bagan/Howrah.
|
26,75,194/-
|
53,510/-
|
3,000/-
|
04(four)
months from date of acceptance.
|
|
11.
|
Balance Work of Renovation of Various Control
Rooms, other related rooms at Howrah under AEN/W/HWH.
|
19,31,500/-
|
38,630/-
|
2,000/-
|
04(four)
months from date of acceptance.
|
|
12.
|
Improvement of PF
surface and column with other ancillary works of PF no. 10
& 11 at Howrah station under AEN/W/HWH.
|
49,50,000/-
|
99,000/-
|
3,000/-
|
04(four)
months from date of acceptance.
|
|
DEN/3/HWH |
|
¤
13. |
Replacement of trough
plate [ Br.No.176, 180, 181, 187, 189A & 194 ] and Arch
Bridges [ Br.No.186, 201, 40 & 56 ] by RCC Slab / Box in
different Bridges upto 6’ Span in B.B.Loop under AEN/KWAE.
|
44,87,959/-
|
89,760/-
|
3,000/-
|
06(six)
months from date of acceptance
|
|
¤
14. |
Replacement of trough
plate / girders / arch by
RCC Slab in various Bridges in TAK Branch line under AEN/BDC.
|
31,98,229/-
|
63,970/-
|
3,000/-
|
06(six)
months from date of acceptance
|
|
**
15. |
External Zone (Zone No. 34)
Zonal works for only external repairs/maintenance of colony
buildings (excluding road & bridge works) under AEN/BDC.
|
17,00,000/-
|
34,000/-
|
2,000/
|
PE
30.06.09
|
|
¤
**
16 |
Bridge Zone (Zone No. 41)
Zonal works – for all bridge works under AEN/KWAE.
|
20,00,000/-
|
40,000/-
|
2,000/
|
PE
30.06.09
|
|
DEN/Br./HWH
|
|
¤
17. |
Re-girdering of
Bridge No – 12 (3x60’-0”) at KM 7/12-13 in
B.B.Loop under AEN/KWAE.
|
48,12,835/-
|
96,260/-
|
3,000/-
|
06(six)
months from date of acceptance
|
|
¤
18. |
Strengthening and repairing
of corroded members of Br. No. - 20 & 83 and Painting of
Br. No. 83 on B.B. Loop etc
under DEN/BR/HWH.
|
24,91,193/-
|
49,830/-
|
3,000/-
|
06(six)
months from date of acceptance
|
|
¤
19. |
Construction of diversion of
connecting newly constructed of Br. No. 240
(1x6x28’-0’’) at km 276.50 in UP of SBG Loop.
|
71,14,420/-
|
1,42,290/-
|
5,000/-
|
10(ten)
months from date of acceptance
|
|
|
|
N. B.: |
i) |
If any plan /drawing is supplied /attached with
Tender Form, Rs. 200/- per plan/
drawing will be levied
extra.
|
| |
ii) |
If any Tender Form is to be sent by Regd. Post,
additional Postal Expenses @ Rs. 500/-
per Tender Form will
be charged.
|
| 1. |
All
tender forms are available for sale in the office of Sr.
Divisional Engineer (Co-ordn.)/Howrah on production of
money receipt for the cost of tender form
(non-refundable) deposited with Chief Cashier/Eastern
Railway, Kolkata
or any of the Goods Shed Superintendent of Howrah &
Sealdah Division or Booking Supervisor – Howrah at
Howrah station from 12.00 to 16.00 hrs on any
working day between 09.09.08 to 23.09.08 (except
holiday). The
sale of tender form will be closed at 16.00 hrs on
23.09.08. The tender document will be received on
24.09.08 up to 14.00 hrs. and the same will be
opened at 14.30 hrs. on the same date. If the
office is closed on the stipulated date & time due
to some unaccounted holiday or bandh etc, the tender
papers will be received
and opened on the next working day at the same time.
|
|
2. |
Eligibility
criteria and all other information are available in the
tender document.
|
| |
Similar work for
executed against Sl. No. 1, 4, 5, 7, 8, 9, 10, 11, 12
& 15 shall be ‘Any Civil Engineering Work.’
|
|
|
¤ Similar work for executed against Sl. No. 13, 14, 16,
17, 18, & 19 ‘Construction of Any Type of Bridge
Work.’
|
|
4.
|
The
tender documents will also be available on Website www.tendertimes.com.
The same can be downloaded and used as tender documents
for submitting the offer. This facility is available
free of cost. However, the Demand Draft (drawn in f/o FA
& CAO/E. Rly/Kolkata) towards the cost of tender
document as prescribed above will have to be enclosed
along with the tender document while submitting the
same. In case the offer is not accompanied with the
valid demand draft for the cost of the tender document
as detailed above, the tender will be summarily
rejected.
|
| |
Eligibility
Criteria:-
|
|
|
(A)
For works costing up to Rs.10 lakhs. :- Please sec the
Tender document.
|
|
|
(B) Works amounting above Rs. 10 lakhs. :- |
|
|
|
|
|
|
1. |
Tenderer should have completed in the last three
financial years (i.e., current year and three
previous financial years) |
At least one similar single work for a minimum value
of 35% of advertised Tender value of work. |
|
2. |
Total contract amount received during the last three
financial years i.e. current year and three
previous financial years. |
Should be a minimum of 150% of Advertised Tender
value. Tender Committee would satisfy themselves
about the authenticity of the certificate produced
by the tenderer(s) to this effect which may be an
attested certificate from the employer/client,
audited balance sheet duly certified by the
chartered Accountant etc. |
|
|
|
|
|
| 5. |
Following documents should be submitted along
with the tender :-
|
| a) |
List of personnel, organisation available on hand
& proposed to be engaged for the subject work.
|
| b) |
List of Plant & machinery
available on hand (own) & proposed to be inducted (own
& hired) to be given separately for the subject
work.
|
| c) |
List of Works completed in
the last three financial years giving description of work,
organisation for whom executed, approximate value of contract at the time of award, date
of award & date of schedule completion of work. Date of actual start,
actual completion & final value of contract should
also be given.
|
| d) |
List of works on hand
indicating description of work, contract value and
approximate value of balance work yet to be done and date of award.
|
| Note
:-
|
|
|
1. |
In case of items (c) &
(d) above supportive documents/certificates from
the organisations whom they worked/are working
should be enclosed.
|
|
|
2. |
Certificate from private
individuals for whom such works are executed/
being executed will not be accepted
|
|
|
3. |
In case of getting
‘identical rate’ by two or more contractors
for one tender the offer of the tenderer who has
received more total contract amount during last
03 financial years and current financial year
will be considered.
|
|
**This
is applicable for Item No. 15 & 16 |
**4. |
If
penalty has been imposed on the tenderer in any
‘work order’ of any Zonal Contract in Howrah
Division during the last three (03) years, then
the tenderer will not be considered for this
Zonal work. |
|
|
|
|
For
Divisional Railway Manager,
|
|
|
E.
Rly,/Howrah
|
|
*Tender