Open
Tender Notice No.:- 17/2008-09
|
Sealed Open Tenders are invited for the
under-mentioned work:- |
|
|
| Sl.
No. |
Description of work
|
Approx
cost (Rs)
|
Earnest
Money (Rs) |
Cost
of Tender Form (Rs) |
Completion
Period |
|
Sr.
DEN/1/HWH |
|
1.
|
Repairs
to and changing of iron work making joints water tight of
OH/PS tank at LLH Rly. colony, LLH station, UPA, KOG, RIS
& SRP under AEN/1/LLH.
|
22,26,433/- |
44,530/- |
3,000/-
|
05(five)
months from date of acceptance
|
|
2.
|
Replacement
of trough plate/girder/arch by RCC slab in various bridges in
TAK branch line under AEN/BDC. |
37,90,139/- |
75,810/- |
3,000/-
|
06(six)
months from date of acceptance
|
|
3.
|
Work
at Sheoraphuli station for (i) renovation/replacement of
existing AC/GI sheet by aluminium sheet of existing PF shed,
(ii) renovation of existing FOB including covering shed with
other ancillary work &
(iii) provision of addl. PF shed with other ancillary
works at PF no.1 to 6.
|
79,04,552/- |
1,58,100/- |
5,000/-
|
06(six)
months from date of acceptance
|
|
4. |
Work
at Sheoraphuli station for (i) improvement to circulating area
including approach road by mastic flooring etc with other
ancillary works & (ii) renovation and improvement of
station manager’s office, Booking office and other ancillary
works.
|
53,35,432/- |
1,06,710/- |
5,000/-
|
06(six)
months from date of acceptance
|
|
5. |
Work
at Chandenagore station for (i) provision of addl. PF shed at
PF nos.1 & 2 covering of FOB by aluminium sheet and other
ancillary works & (ii) replacement of AC/CI sheet by
aluminium sheet of existing PF shed of PF nos.1, 2 & 3.
|
60,99,807/- |
1,22,000/- |
5,000/-
|
06(six)
months from date of acceptance
|
|
6. |
Work
at Chandernagore station for (i) improvement of station
building, Booking office, PRS, toilets etc, (ii) repairs to
and improvement to subway and circulating area with other
ancillary works & (iii) improvement of PF surface,
benches, water booths, urinal etc at PF nos.2-3 at CGR.
|
81,61,864/- |
1,63,240/- |
5,000/-
|
06(six)
months from date of acceptance
|
|
Sr.
DEN/2/HWH
|
|
7. |
Assisting
of SKV welding (2796 Nos. joints) under Sr. DEN/2/HWH.
|
30,91,865/- |
61,840/- |
3,000/-
|
11(eleven)
months from date of acceptance
|
|
8. |
Reconditioning
of Worn-out tamping tools by using xalloy – 52 kg &
Abrocar – 184 under Howrah Division.
|
7,93,800/- |
15,880/- |
2,000/-
|
11(eleven)
months from date of acceptance
|
|
9. |
Construction
of R.P.F Barrack at Burdwan under AEN/BWN.
|
23,95,983/- |
47,920/- |
3,000/- |
05(five)
months from date of acceptance
|
|
10. |
Manufacturing
fabricating IN-SITU Glued insulated joints 52 kg/ 60 kg in the
jurisdiction of Sr. DEN/2/HWH.
|
18,70,224/- |
37,410/- |
2,000/- |
11(eleven)
months from date of acceptance
|
|
11. |
Retaining
wall from km 91/23A to 92/1A on UP Fly over line between SKG
and PLAE under AEN/BWN.
|
53,35,333/- |
1,06,710/- |
5,000/- |
04(four)
months from date of acceptance
|
|
12. |
Assisting
of BCM machine and manual deep screening in the section of Sr.
DEN/2/HWH.
|
36,29,962/- |
72,600/- |
3,000/- |
11(eleven)
months from date of acceptance
|
|
13. |
Rail
painting under AEN/2/LLH.
|
12,50,020/- |
25,000/- |
2,000/- |
06(six)
months from date of acceptance
|
|
14. |
Rail
painting under AEN/BWN.
|
12,50,020/- |
25,000/- |
2,000/- |
06(six)
months from date of acceptance
|
|
Sr.
DEN/4/HWH
|
|
15. |
Construction
of stabling facility as well as pit under shed for new 140T
diesel crane base at RPH.
|
27,92,395/- |
55,850/- |
3,000/-
|
06(six)
months from date of acceptance
|
|
16. |
Hiring
of vehicles for transportation of various track and other
railway materials on a regular basis for day to day
maintenance of track under SSE/P.Way/BHP, RPH, NHT, PKR, AZ
for a period of three years.
|
57,84,804/- |
1,15,700/- |
5,000/-
|
03(three)
years from date of acceptance
|
|
17. |
Provision
of PF shed at Kotalpukur, Tilbhita, Bonpas, Swadinpur and
Pichkurir Dhal under Sr. DEN/4/HWH.
|
37,38,065/- |
74,770/- |
3,000/-
|
06(six)
months from date of acceptance
|
|
18. |
Manufacturing,
fabricating 52 kg/60 kg IN SITU Glued insulated joint under
Sr. DEN/4/HWH.
|
61,68,960/- |
1,23,380/- |
5,000/-
|
10(ten)
months from date of acceptance
|
|
19. |
Conversion
of aqua privy into sanitary type (Total = 202 units) under AEN/BHP.
|
26,46,489/- |
52,930/- |
3,000/-
|
4(four)
months from date of acceptance
|
|
20. |
Replacement
of girder by RCC box of Br. No. 106A between Bataspur and
Sainthia on UP Line of SBG Loop under AEN/BHP.
|
20,08,514/- |
40,170/- |
3,000/-
|
4(four)
months from date of acceptance
|
|
21. |
Extension
of barrel length of Br. No. 142 (3x3.85 and Br. No. 145
(6x4.55m) with strengthening of arch on UP Main Line side of
SBG Loop under AEN/BHP.
|
45,74,308/- |
91,490/- |
3,000/-
|
06(six)
months from date of acceptance
|
|
22. |
Up-gradation
of manned level crossing gate nos. 39, 40 & 43 in SBG Loop
section under PWI/PKR.
|
15,48,735/- |
30,980/- |
2,000/-
|
4(four)
months from date of acceptance
|
|
23. |
Up-gradation
of manned level crossing gate nos. 32, 33 in SBG Loop & LC
gate no. 1 AZ-NHT section under PWI/NHT.
|
29,00,000/- |
58,000/- |
3,000/-
|
4(four)
months from date of acceptance
|
|
24. |
Removal
of infra structural deficiencies of unmanned L.C. gate under
AEN/RPH.
|
7,61,049/- |
15,230/- |
2,000/-
|
4(four)
months from date of acceptance
|
|
25. |
Removal
of infra structural deficiencies of unmanned L.C. gate under
AEN/BHP.
|
19,02,622/- |
38,060/- |
2,000/-
|
4(four)
months from date of acceptance
|
|
26. |
Strengthening
of arches, piers & abutment by RCC jacketing for 32
bridges of HWH Division under Sr. DEN-4/HWH.
|
3,99,67,392/- |
3,49,840/- |
10,000/-
|
14(fourteen)
months from date of acceptance
|
|
27. |
Extracting
& sinking of tubewells in the section of SSE(W)/RPH under
AEN/RPH.
|
22,78,550/- |
45,580/- |
3,000/-
|
04(four)
months from date of acceptance
|
|
DEN/SPL/HWH
|
|
28. |
Improvement
of staff Qrs. along with other ancillary works at Golmohar
Colony (For over all improvement as model colony) under AEN/W/HWH.
|
54,71,488/- |
1,09,430/- |
5,000/- |
06(six)
months from date of acceptance |
|
29. |
Through
formation treatment on BB loop (Single line) km 127/9-128/7,
km 132/3-134/7, km 136/11-12, km 140/6-141/11, km 145/7-13 etc
(Total = 3.70 kms) under AEN/AZ. |
1,03,80,140/- |
2,01,910/- |
5,000/- |
11(eleven)
months from date of acceptance
|
|
DEN/3/HWH
|
|
30. |
Through
Bridge Timber Renewal with Channel Sleeper over Br. No. 180A
at km. 114/5-6 in between KWAE-GGLE, Br. No. 62 (TAK Br.)
& Br. No. 69 in UP M/L under jurisdiction of DEN/3/HWH.
|
22,92,371/- |
45,850/- |
3,000/-
|
04(four)
months from date of acceptance
|
|
31. |
Extension
of barrel length and RCC jacketing of Bridge No.80 at Km.40.61
in bet. BDC – ADST in Main Line under AEN/BDC.
|
44,87,000/- |
89,740/- |
3,000/-
|
04(four)
months from date of acceptance
|
|
32. |
Replacement
of girder by RCC/PSC Slab of Bridge No.173 at Km.110/8-9 &
Bridge No.168A at Km.108/8-9 bet. KWAE – GGLE in BB Loop
under AEN/KWAE.
|
82,12,000/- |
1,64,240/- |
5,000/-
|
08(eight)
months from date of acceptance
|
|
33. |
Improvement
to road surface by providing rubberized surface at Level
Crossing No. 12[Spl.] at Km.42/9-11 & 13[Spl.] at
Km.45/15-17 in Main Line under AEN/BDC.
|
45,27,000/- |
90,540/- |
3,000/-
|
04(four)
months from date of acceptance
|
|
34. |
Improvement
to road surface by providing rubberized surface at Level
Crossing No. 19[Spl.] at Km.66/5-7 & 38[Spl.] at Km.87/1-3
in Main Line under AEN/BDC.
|
45,27,000/- |
90,540/- |
3,000/-
|
04(four)
months from date of acceptance
|
|
35. |
Removal
of infrastructural deficiencies at various level crossing
gates from BDC to KWAE under AEN/KWAE.
|
44,24,000/- |
88,480/- |
3,000/-
|
04(four)
months from date of acceptance
|
|
36. |
Repairing
& changing of iron plates, iron works, making out joint
end water tight of OH/PS Tank at BSAE, KWAE, NDAE & SALE
under SE[W]/NDAE under AEN/KWAE.
|
14,00,000/- |
28,000/- |
2,000/-
|
04(four)
months from date of acceptance
|
|
37. |
Replacement
of [1 x 5750 + 1 x 5800] Span Skew Girder by RCC box [ 2 x
4600 ] Span along with RCC flooring, CC curtain wall &
drop wall of Bridge No.154 at Km.100/8-9 bet. stations KWAE
– DHAE in BB Loop under AEN/KWAE.
|
29,90,000/- |
59,800/- |
3,000/-
|
06(six)
months from date of acceptance
|
|
DEN/Br/HWH
|
|
38. |
Conversion
of girder subway into RCC Box in HWH-BWN M/Line.
|
1,90,99,222/- |
2,45,500/- |
5,000/-
|
10(ten)
months from date of acceptance
|
|
39. |
Replacement
of girder of DN Line by RCC BOX of Br. No. 222 & 226 etc.
on SBG Loop.
|
1,97,60,820/- |
2,48,810/- |
5,000/-
|
15(fifteen)
months from date of acceptance
|
|
40. |
Replacement
of girder of DN Line by RCC BOX of Br. No. 223 & 228 etc.
on SBG Loop.
|
1,83,57,255/- |
2,41,790/- |
5,000/-
|
15(fifteen)
months from date of acceptance
|
|
DEN/Arbn/HWH
|
|
41. |
Development
of Sports Complex at Howrah under AEN/W/HWH.
|
69,79,678/- |
1,39,600/- |
5,000/- |
07(seven)
months from date of acceptance |
|
**
42.
|
Road Zone (Zone No. 10)
Road works under AEN/Works/Howrah.
|
15,00,000/-
|
30,000/-
|
2,000/-
|
PE
30.06.09
|
|
|
|
N. B.: |
i) |
If
any plan /drawing is supplied /attached with Tender
Form, Rs. 200/- per plan/
drawing will be levied
extra
|
| |
ii) |
If
any Tender Form is to be sent by Regd. Post, additional
Postal Expenses @ Rs. 500/-
per Tender Form
will be charged.
|
| 1. |
All
tender forms are available for sale in the office of Sr.
Divisional Engineer (Co-ordn.)/Howrah on production
of money receipt for the cost of tender form
(non-refundable) deposited with Chief Cashier/Eastern
Railway, Kolkata
or any of the Goods Shed Superintendent of Howrah &
Sealdah Division or Booking Supervisor –
Howrah at Howrah station from 12.00 to 16.00
hrs on any working day between 01.12.08 to 15.12.08 (except
holiday). The
sale of tender form will be closed at 16.00 hrs on
15.12.08. The tender document will be received on
16.12.08 up to 14.00 hrs. and the same will be
opened at 14.30 hrs. on the same date. If the
office is closed on
the stipulated date & time due to some unaccounted
holiday or bandh etc, the tender papers will be received
and opened on the next working day at the same time.
|
|
2. |
Eligibility
criteria and all other information are available in the
tender document.
|
| |
(a)
Similar
work for executed against Sl. No.
1,3,4,5,6,9,11,15,19,22,23,25,27,28,33,34,35,36,41&42
shall be ‘Any Civil Engineering Work.’
|
|
|
(b)
Similar work for executed against Sl. No.
2,26,31,32,37,39&40 shall be’ Construction
of Any Type of Bridge Work.’
|
|
|
(c)
Similar work for executed against Sl. No.
7,10,12,13&14 shall be ‘Execution of Any
P.Way work in running line.’
|
|
|
(d)
Similar work for executed against Sl. No.
16 shall be ‘Any works of transportation of vehicle hiring’.
|
|
|
(e)
Similar work for executed against Sl. No.
17 shall be ‘Any structural steel fabrication
work’.
|
|
|
(f)
Similar work for executed against Sl. No. 18
shall be ‘Execution of IN-SITU Glued insulated
joint’.
|
|
|
(g)
Similar work for executed against Sl. No. 20 & 21
shall be ‘Construction of any type of bridge/bridge
jacketing work’.
|
|
|
(h)
Similar work for executed against Sl. No. 29 shall be
‘Execution of earth work in formation with mechanical
compaction’.
|
|
|
(i)
Similar work for executed against Sl. No. 30 shall be
‘Any Bridge Channel Sleeper’.
|
|
|
(j)
Similar work for executed against Sl. No. 38 shall be
‘Supplying, fabrication of erecting and launching of
any steel girders/composite girders in bridges’.
|
|
4.
|
The
tender documents will also be available on Website www.tendertimes.com
The same can be downloaded and used as tender
documents for submitting the offer. This facility is
available free of cost. However, the Demand Draft (drawn
in f/o FA & CAO/E. Rly/Kolkata) towards the cost of
tender document as prescribed above will have to be
enclosed along with the tender document while submitting
the same. In case the offer is not accompanied with the
valid demand draft for the cost of the tender document
as detailed above, the tender will be summarily
rejected.
|
| |
Eligibility
Criteria:-
|
|
|
(A)
For works costing up to Rs.10 lakhs. :- Please
sec the Tender document.
|
|
|
(B)
Works
amounting above Rs. 10 lakhs. :-
|
|
|
|
|
|
|
1. |
Tenderer
should have completed in the last three financial
years (i.e., current year and three previous
financial years) |
At
least one similar single work for a minimum value
of 35% of advertised Tender value of work. |
|
2. |
Total
contract amount received during the last three
financial years i.e. current year and three
previous financial years. |
Should
be a minimum of 150% of Advertised Tender value.
Tender Committee would satisfy themselves about
the authenticity of the certificate produced by
the tenderer(s) to this effect which may be an
attested certificate from the employer/client,
audited balance sheet duly certified by the
chartered Accountant etc. |
|
|
|
|
|
| 5. |
Following
documents should be submitted along with the tender
:-
|
| a) |
List
of personnel, organisation available on hand &
proposed to be engaged for the subject work.
|
|
b) |
List
of Plant & machinery available on hand (own) &
proposed to be inducted (own & hired) to be given separately
for the subject work.
|
|
c) |
List
of Works completed in the last three financial years
giving description of work, organisation for
whom executed, approximate value of contract at the
time of award, date of award & date of schedule
completion of
work. Date of actual start, actual completion & final
value of contract should also be given.
|
|
d) |
List
of works on hand indicating description of work, contract
value and approximate value of balance work yet
to be done and date of award.
|
|
Note:- |
|
|
1. |
In
case of items (c) & (d) above supportive
documents/certificates from the organisations
whom they worked/are working should be enclosed.
|
|
|
2. |
Certificate
from private individuals for whom such works are
executed/ being executed will not be accepted
|
|
|
3 |
In
case of getting ‘identical rate’ by two or
more tenderers for one work the offer of the
tenderer who has executed higher value of single
work of similar nature during last 03 (three)
years and current financial year will be
considered.
|
|
**This
is applicable for Item No. 42
|
**4.
|
If
penalty has been imposed on the tenderer in any
‘work order’ of any Zonal Contract in Howrah
Division during the last three (03) years, then
the tenderer will not be considered for this
Zonal work.
|
|
|
|
|
For
Divisional Railway Manager,
|
|
|
E.
Rly,/Howrah
|
|
*Tender