|

|
EASTERN
RAILWAY
(HOWRAH DIVISION)
|
|
|
|
Date:
02.12.2011
|
Open Tender Notice No.:- 23/2011-12
|
|
Sealed Open Tenders are invited in the
prescribed form for and on behalf of the President of India from Tenders
having experience of similar nature of work and required Financial
capabilities including those Registered with Irrigation/CPWD/ SEB/MES or
any public sector undertaking for the following work:-
|
|
|
| Sl.
No. |
Description
of work
|
Approx
cost
(`) |
Earnest
Money
(`) |
Cost
of Tender Form
(`) |
Completion
Period |
|
SR. DEN/1/HWH |
|
1. |
Transporting of P.Way materials under Sr.DEN/1/Howrah.
|
50,15,160/- |
1,00,310/- |
5000/- |
08 (Eight) Months from the date of issue of acceptance. |
|
SR. DEN/2/HWH |
|
2. |
Burdwan diesel shed: Concrete/pucca road of adjacent areas
beside pit No. 1, Repairs to leaky roof of road side station
& staff quarters and Thorough renovation to PS tank at
Ambagan Railway Colony, Burdwan including repairs to RCC OH
tank No. 18 in the section of SE/Works/BWN under AEN/BWN. |
85,16,766/- |
1,70,340/- |
5,000/- |
12 (Twelve) Months from the date of issue of acceptance. |
|
SR. DEN/4/HWH |
|
3. |
Through Formation Top Rehabilitation at various location by
providing sand dumping along with provision of wider cess
and sub bank with provision of boulder drain, filling of
borrow pit over UP & DN SBG loop from Km 120.00-120.40, Km
125.00-126.30, Km 144.10-144.60, Km 155.80-157.10 etc.
(Total = 3.50 Km) under AEN/Rampurhat |
1,10,27,836/- |
2,05,140/- |
5,000/- |
08 (Eight) Months from the date of issue of acceptance
letter. |
|
4. |
Rehabilitation of cess formation in the jurisdiction of AEN/BHP. |
91,57,172/- |
1,83,150/- |
5,000/- |
06 (Six) Months from date of issue of acceptance letter. |
|
5. |
Provision of Rest Room for machine staff at Mollarpur.
|
6,37,741/- |
12,760/- |
2,000/- |
03 (Three) Months from the date of issue of acceptance
letter. |
|
6. |
Construction of pucca drain in between line no. 3 & 4 at
Rampurhat station under AEN/Rampurhat.
|
9,34,171/- |
18,690/- |
2,000/- |
04 (Four) Months from the date of issue of acceptance
letter. |
|
7. |
HWH DIVN: SBG LOOP: TTR of existing 90R/52 Kg Points &
crossing on wooden layout with concrete sleeper with
necessary CMS crossing & curved switches 1 in 8.5= 40 sets &
1 in 12 = 7 sets, Total=47 sets. Under Sr. DEN/4/HWH. |
58,61,863/- |
1,17,240/- |
5,000/- |
Seven (07)
months
from the date of issue of acceptance letter. |
|
8. |
Provision of special RCC OH tank 50000 gallons capacity and
pipe lines for improvement of water supply at Rampurhat
under AEN/Rampurhat. |
69,09,373/- |
1,38,190/- |
5,000/- |
06
(six) months from the date of issue of acceptance letter. |
|
9. |
Through fitting renewal of 52/60 Kg rail on UP SBG Km. 7.30
to 10.43, Km 12.00 to 14.00, Km 46.00 to 50.00, Km 110.00 to
125.00, 134.5 to 156.00 & DN SBG loop Km 3.00 to 38.00, Km
99.00 to 110.00, 110.00 to 125.00, Km 130.50 to 156.00
(Total 132.13 Km) in the jurisdiction of Sr. DEN/4/HWH. |
55,28,718/- |
1,10,580/- |
5,000/- |
06
(six) months from the date of issue of acceptance letter. |
|
10. |
Zone
No. 20A:
Km 100/0 to km 142/0 i.e. from Rampurhat (excluding) to
Rajgram including Rajgram quarry. The work includes all
general work, sanitary work, wood work bridge work, road
works etc. under the jurisdiction of AEN/Rampurhat. |
28,00,000/- |
56,000/- |
3,000/- |
PE
30.06.12 |
|
|
|
N.B.: |
i)
If any plan /drawing is supplied /attached with Tender
Form,
`
200/- per plan/ drawing will be levied extra |
| |
ii) If any Tender Form is to be sent by Regd. Post,
additional Postal Expenses @
`
500/- per Tender Form will be charged.
|
|
1. |
All tender forms are available for sale in the office of
Sr. Divisional Engineer (Co-ordn.)/Howrah on production
of money receipt for the cost of tender form
(non-refundable) deposited with Chief Cashier/Eastern
Railway, Kolkata or any of the Goods Shed Superintendent
of Howrah & Sealdah Division or Booking Supervisor –
Howrah at Howrah station from 12.00 to 16.00 hrs
on any working day between 23.12.11 to 06.01.12
(except holiday). The sale of tender form
will be closed at 16.00 hrs on 06.01.12. The tender
document will be received on 09.01.12 up to 14.00
hrs. and the same will be opened at 14.30 hrs.
on the same date. If the office is closed on the
stipulated date & time due to some unaccounted holiday
or bandh etc, the tender papers will be received and
opened on the next working day at the same time. |
|
2. |
Eligibility criteria and all other information are available in the
tender document.
|
|
3.
|
(a) Similar work for executed against Sl. No
1‘Transportation of rails or sleepers with mechanical
loading/unloading.’ |
|
|
(b) Similar work for executed against Sl. No 2 ‘Any
Civil Engineering works.’ |
|
|
(c) Similar work for executed against Sl. No 3 & 4
‘Execution of earth work in formation with mechanical
compaction.’ |
|
|
(d) Similar work for executed against Sl. No 7 & 9
‘Execution of P.Way work in running line.’ |
|
|
(e) Similar work for executed against Sl. No 8 ‘Construction
of RCC over head tank of same or more capacity with
other related works or construction of any RCC Bridge
work.’ |
|
4.
|
The tender documents will also be available on Website
www.tendertimes.com.
The same can be downloaded and used as tender documents
for submitting the offer. This facility is available
free of cost. However, the Demand Draft (drawn in f/o FA
& CAO/E. Rly/Kolkata) towards the cost of tender
document as prescribed above will have to be enclosed
along with the tender document while submitting the
same. In case the offer is not accompanied with the
valid demand draft for the cost of the tender document
as detailed above, the tender will be summarily
rejected. |
|
|
Eligibility
Criteria:- |
|
|
(A) |
For
works costing up to ` 50 lakhs. :- Please see the Tender document |
|
|
(B) |
Works amounting above
`
50 lakhs. :- |
|
|
|
1. |
Tenderer should have completed in the last three financial years (i.e.,
current year and three previous financial years) |
At least one similar single work for a minimum value of 35% of
advertised Tender value of work. |
|
2. |
Total contract amount received during the last three financial years
i.e. current year and three previous financial years. |
Should be a minimum of 150% of Advertised Tender value. Tender Committee
would satisfy themselves about the authenticity of the certificate
produced by the tenderer(s) to this effect which may be an attested
payments certificates issued by Govt. Deptt./Public Sector Units,
audited balance sheet duly certified by the chartered Accountant etc. |
|
|
5. |
Following documents should be submitted along with the tender
:-
|
|
|
a)
|
List of personnel, organisation available on hand &
proposed to be engaged for the subject work. |
|
|
b)
|
List of Plant & machinery available on hand (own) &
proposed to be inducted (own & hired) to be given
separately for the subject work. |
|
|
c)
|
List of Works completed in the last 3 (three) financial
years giving description of work, organisation for whom
executed, approximate value of contract at the time of
award, date of award & date of schedule completion of
work. Date of actual start, actual completion & final
value of contract should also be given. |
|
|
d)
|
List of works on hand indicating description of work,
contract value and approximate value of balance work yet
to be done and date of award. |
|
Note: |
|
|
|
1.
|
In case of items (c) & (d) above supportive
documents/certificates from the organisations with whom
they worked/are working should be enclosed. |
|
|
2.
|
Certificate from private individuals for whom such works
are executed shall not be accepted. The work which is
executed for fulfilling criteria No. 1&2 should be under
taken from Govt. Organization or Public Sector Units. |
|
|
3.
|
In
case of getting “identical rate” by two or more
tenderers for one work the offer of the tenderer who has
executed higher value of single work of similar nature
during last 03 (three) years and current financial year
will be considered. |
|
|
|
|
|
|
|
|
|
For
Divisional Railway Manager,
|
|
|
|
|
Eastern Railway/Howrah
|
|
|
|
|
|
|
|
|