|

|
EASTERN
RAILWAY
(Electrical
Construction Department)
|
|
|
|
TENDER
NOTICE
|
Detailed Tender Notice No. : EL/SDAH/CON/TRD-01
of 2009-10.
|
|
1. |
Sealed tender is invited
by Chief Electrical Engineer (Con), Eastern Railway, Kolkata for and on
behalf of the President of India from experienced Electrical Contractors
holding valid electrical contractor’s license, Partnership firms etc.
with adequate financial capability and sufficient experience for the
following works:
|
|
It.
No.
|
Name of work
|
Approx Value
(Rs) |
Cost
of
Tender Document
(Rs.) |
Earnest
Money
(Rs.) |
Completion
period |
Date
of
opening. |
|
1. |
"Design,
Drawing, Supply, Erection, Testing & Commissioning of 25 KV a.c.
Single Phase Overhead Equipment, LT supply transformer and switching
station in connection with the work of gauge conversion from Santipur to
Krishnanagar in SEALDAH Division of Eastern Railway."
BID
DOCUMENT HOSTED ON 24.12.09 |
3.754
Crores. |
10,000/- |
3.377
Lakhs. |
10
(Ten) Months. |
08.01.2010 |
|
|
|
|
2. |
Detail
scope of work is available in the tender documents. Eligibility
criteria for participation in tender are indicated below. Tenderer
should go through this eligibility criteria before purchasing the
tender documents.
|
|
3.1 |
(a)
|
Tenderer
should have completed at least one work of similar nature, for a
minimum value of 35% of advertised tender value of work in the last
three financial years (i.e. current year and three previous
financial years). Similar nature means, “Design, Drawing, Supply, Erection, Testing & Commissioning of 25 KV
a.c. Single Phase 50Hz Overhead Equipment (OHE) works with 25KV
switching station works (i.e. SSP, SS, SP, FP ) on Railways, PSU’s
& any other Government department etc.”. Tenderer
has to produce supportive documents/ certificates from the
organization for whom they have worked along with the tender offer.
If part works has/have been commissioned and is/are under use, the
amount with respect to that/those portions of commissioned works can
be considered as qualifying amount against the above certificate. Certificates
from Private individual/Private Limited Company/Public Limited
Company (Private sector) for whom such works are executed shall not
be accepted. Certificates from Govt./Semi Govt./PSU/Govt. autonomous
bodies/Public Limited Company (Govt. sector) will only be accepted.
|
|
|
(b)
|
Total
contract amount received by the tenderer during last 3 financial
years and in the current financial year should be a minimum of 150%
of advertised tender value. Tenderer has to produce attested
certificate from the employer/client, audited Balance sheet duly
certified by the Chartered Accountant etc. along with the tender
offer.
|
|
3.2 |
The
3 years period mentioned in paras 3.1(a) & (b) shall be reckoned
from the date of opening of tender in question as originally
advertised in the Newspaper. The extended date of opening, if any,
shall not be taken into account for the purpose of counting the
above period of 3 years.
|
|
4.
|
Tender
Documents (non-transferable) embodying terms and
conditions can be obtained from the office of Deputy Chief Electrical
Engineer (CON), Eastern Railway, Sealdah, RMS Building (3rd
floor), Kaiser Street, Kolkata-700014 on and from
24.12.2009 between 11:00 hrs. to 17:00 hrs. up to a
working day earlier to the date of opening. For purchasing
Tender Document, the cost of the tender document as
mentioned above should be deposited with the Sr.
Divisional Cashier/Con, E.Rly., 3, Koilaghat Street,
Kolkata-700001 between 11:00 Hrs. and 14:00 Hrs. and
receipt obtained should be deposited to Deputy
Chief Electrical
Engineer (CON), Eastern Railway, Sealdah towards the
set of Tender Documents.
|
|
5.
|
The
tender notice/documents will also be available on Website "www.tendertimes.com"
This facility is available during the above-mentioned
period and the same can be downloaded and used as tender
documents for submitting the offer. This facility is
available free of cost.
|
|
|
However,
the Demand Draft (which should be drawn in favour of FA
& CAO/Con/E.Rly/Kolkata) towards the cost of tender
document as prescribed above will have to be enclosed
along with the tender document while submitting the same.
In case the offer is not accompanied with the valid demand
draft for the cost of the tender document as detailed
above, the tender will be summarily rejected.
|
|
6.
|
The
Tenderers are advised to visit the site of work and
acquaint themselves with the conditions and expected
quantum of work in their own interest before submitting
their offer. For this, the tenderer should contact Deputy
Chief Electrical Engineer/Construction/Sealdah at his
office at Sealdah.
|
|
7.
|
The
tender must be accompanied with the prescribed amount of
Earnest Money as mentioned above in acceptable form as
mentioned in the tender documents. Adjustment of Earnest
Money submitted with earlier tender or accepted tender
shall not be done and tender received without prescribed
Earnest Money will be liable to be summarily rejected.
|
|
8.
|
Tenders
complete in all respects and with all documents as
stated above should be deposited in the tender box kept
in the office of the Chief
Electrical Engineer/Construction, Eastern Railway, 4th
floor, 17, Netaji Subhas Road,
Kolkata-700001.
|
|
9.
|
The
tender will be received in the office of the Chief
Electrical Engineer/Construction, Eastern Railway, Kolkata,
upto 14:00 Hrs. on the date of opening indicated above and
opened on the same day at 14:30 Hrs. in presence of the
tenderers or their authorized representative, who wish to
remain present. Tenders duly sealed in the prescribed
manner as above can also be sent through registered post
so as to reach in the office of the Chief Electrical
Engineer/Construction, Eastern Railway, Kolkata, not later
than 14:00 hrs on the aforesaid date.
|
|
10.
|
In
case the date of opening mentioned above is declared
holiday/Strike/Bandh, on any account, the Tenders will be
received and opened on following working day at same time
and same venue.
|
|
11.
|
If
the tenderer/s deliberately gives wrong information, whose
credentials / documents in his / their tenders and thereby
create (s) circumstances for acceptance of his / their
tender, Railway reserves the right to reject such tender
at any stage, besides, shall suspend the Business for one
year.
|
|
12.
|
Construction
workers cess @ 1% of the cost of construction work will be
deducted from the bill of the contractor. Cost of
materials supplied under separate item shall be outside
the purview of the cess.
|
|
13. |
Payment
will be remitted through EFT. The Tenderers are
required to declared Bank details and A/C No. etc. in
the Tender Form.
|
|
14. |
Railway
reserves its right to either cancel the tender or reject
any or all the tenders without assigning any reason
thereof.
|
|
|
|
|
|
|
Deputy
Chief Electrical Engineer/Construction
|
|
|
Sealdah
|
|
|