EASTERN  RAILWAY
(Construction Department)

 

Details of Contractors Concluded during the Month of May'2007

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Tender No. Item/ Nature of work Mode of Tender Enquiry Date of publication of NIT Type of Bidding (Single/ Two Bid system) Last date of receipt of tender Nos. of tenders recd. Nos. and names of parties qualified after technical evaluation Nos. and names of parties not qualified after technical evaluation Whether contract awarded to lowest tenderer/ Evaluated L1 Contract No. & Date Name of Contractor Value of Contract Scheduled date of completion of supplies
93 of 2006-07 (Open)

Constn. Of platform No.23 alongwith washable opron in c/with Tikiapara- Howrah.

(Open) 08.02.07 Single 13.03.07 3 Nos. N.A. N.A. L-1 CAO/Con/ wt /8072 dt. 04.05.07. M/s. Shyamal Mukhopadhya. Rs. 4.20 Crores. 8(Eight) months i.e. 03.01.08
62 of 2006-07 (Open) E/work in cutting and embank ment including station yard bet. Habra to Chandpara (Sec.III) (Open) 31.10.06 Single 19.12.06 2 Nos. N.A. N.A. L-2 CAO/C/ WT /7069 dt. 09.05.07. AKMPREMCO (JV) Rs. 5.33 Crores. 18 (Eighteen) months i.e. 08.11.08
117 of 06-07 (Open) Residual work for E/Work in cutting bask filling etc. from Ch.(-)2.10 to 0.90 Km in c/with Deoghar -Dumka. (Open) 13.03.07 Single 04.04.07 2 Nos. N.A. N.A. L-1 CAO/C/ WT/8099 dt. 10.05.07 Royal Forgings (Pvt) Ltd. Rs. 8.32 Crores. 6(Six) months i.e. 09.11.07
86 of 06-07 (Open) E/work in formation by filling wing wall etc. in c/with new B.G. Line from Dumka to Rampurhat (Ch.104.85 to 107.00). (Open) 26.12.06 Single 29.01.07 One N.A. N.A. L-1 CAO/C/ WT/8053 dt. 10.05.07 M/s.Kwality Constn. Rs.5.45 Crores. 18 (Eighteen) months i.e. 09.11.08
70 of 06-07 (Open) Residual work of E/work in Sec.II from Ch. 5.750 to Ch.12.230 Km. in C/with new B.G. Rail from Deoghar to Sultanganj (Risk & Cost). (Open) 12.01.07 Single 13.02.07 05 N.A. N.A. L-1 CAO/C/ WT/8028 dt. 16.05.07 Bohra M.M.G. Constn. Rs.6.32 Crores. 18 (Eighteen) months i.e. 15.11.08
77 of 06-07 (Open) E/work in formation by filling in c/with proposed New B.G.Line between Dumka and Rampurhat from Ch. Km.118.35 to Km. 120.636. (Open) 19.12.06 Single 22.01.07 2 Nos. N.A. N.A. L-1 CAO/C/ WT/8056 dt. 18.05.07 H.S.J. Enterprise Rs.4.70 Crores. 18 (Eighteen) months i.e. 17.11.08
105 of 06-07 (Open) Constn. Of connecting Rd. to Deoghar Stn. And other ancillary work in c/with proposed new B.G. Line between Deoghar and Dumka. (Open) 23.02.07 Single 27.03.07 One N.A. N.A. L-1 CAO/C/ WT/8074 dt. 22.05.07 M/s. Bateshwar Singh Rs.2.95 4(Four) months i.e. 21.09.08
   