DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF September - 2011.

Tender No. Name of work Mode of Tender Enquiry Date of publication of NIT Type of Bidding (Single/ Two Bid system) Last date of Receipt of Tender No. of Tenders received No & names of parties qualified after technical Evaluation No & names of parties Not qualified after technical Evaluation Whether contract awarded to Lowest tenderer evaluated as L-I 
 
Contract No. with  Date Name of contractor Value 
of Contract Rs.
Schedule date of completion of work
1 2 3 4 5 6 7 8 9 10 11 12 13 14 
28 of 11-12 Supplying, Laying, compacting blanketing materials and other miscellaneous works in Section IV in between 16.5 Km. to 21.5 Km. from Tarakeswar Station in connection with construction of new B.G. line from Tarakeswar to Bishnupur. Open 19.7.11 Single 17.8.11 3(Three) - - L-1 CAO/C/WT/8770 dated-26.9.11

M/s Shreema Construction,
Gourhati More, Arambag, Hoogly

Rs. 2.25 cr

05(Five) Months
49 of 11-12 Construction of Bridge No. 37A at Chainage 15007 from Tarakeswar and other miscellaneous works etc. in connection with the construction of new B.G. Railway line from Tarakeswar to Bishnupur. Open 23.8.11 Single 20.9.11 4(Four ) No. - - L-1 CAO/C/WT/8783, dated-29.9.11

M/S shyamal Mukhopadhaya, bandipur upanibesh, P.O. Rahara,,24 Pgs(N)

Rs.3.95Cr.

04(Four) Months

140 of 10-11

Supplying, leading and loading of 200000 m3 of 50 mm size Machine crushed track stone ballast in any type of Railway

Open 4.2.11 Single 16.3.11 3(Three) - - L-1 CAO/C/WT/8708/1 dated-29.7.11

Master Sundar das & Sons, PO & Dist-Pakur,Jharkhand, pin-816107

5.55 Cr. 12(Tewelve) Months

140 of 10-11

Supplying, leading and loading of 200000 m3 of 50 mm size Machine crushed track stone ballast in any type of Railway

Open 4.2.11 Single 16.3.11 3(Three) - - L-1 CAO/C/WT/8708/2 dated-29.7.11 M/s OTAN das & Co., Sidhi Para, Pakur, Jharkand, Pin-816107 5.55 Cr. 12(Tewelve) Months
3 of 11-12 Construction of Bridge No.43A(ROB), 49A(RUB), 50A(ROB) and 64A(ROB) with RCC Box type culvert/slab/wing wall/return wall etc. and other ancillary works for construction of new BG line between Manderhill and Dumka. Open 29.04.11 Single 08.06.11 2 (Two) Nos. - - L-1 CAO/C/WT/8722, dated-23.9.11 M/s New Look-KPTL(JV), 299, Barakhola, M.B.Tower, Mukundapur, Kolkata-700099 9.41 Cr. 04(Four) Months
      