1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
|
41 of 11-12 |
Supplying & spreading of blanketing
materials (stone dust) over formation for doubling work at Km. 177.44 -
186.10 in between Azimganj Junction - Mahipal Road of Eastern Railway in
connection with Azimganj - Manigram doubling project. |
Open |
12.8.11 |
Single |
20.10.11 |
5 nos(Five) |
- |
- |
L-1 |
CAO/C/WT/8785, dt.7.12.11 |
MESA Constn,P-207,Goala
Para Road, Behala, Kolkata-60 |
4.52 Crs |
6 (Six) Months |
|
52 of 11-12 |
Earthwork in excavation,
supplying, spreading and compaction of stone dust blanketing, linking of
track, points & crossing, and supply & unloading of ballast,
transportation of different P.Way materials and other ancillary works in
connection with provision of 4th passenger line in between Kakinara &
Naihati. |
Open |
28.8.11 |
Single |
29.9.11 |
3 nos(Three) |
- |
- |
L-1 |
CAO/C/WT/8792,dt.13.12.11 |
M/S shyamal Mukhopadhaya,
bandipur upanibesh, P.O. Rahara,,24 Pgs(N) |
3.38 Crs |
12(Tewelve) Months |
|
27 of 11-12 |
Construction of stadium
with provision of concrete gallery, Roofing, Drain, various rooms,
sanitary and pipeline, flooring etc at Railway Sports Complex at
Kanchrapara. |
Open |
22.7.11 |
Single |
26.8.11 |
5 nos(Five) |
- |
- |
L-1 |
CAO/C/WT/8760,dt.16.12.11 |
MESA Constn, P-207, Goala
Para Road, Behala, Kolkata-60 |
7.84 Crs |
12(Tewelve) Months |
|
53 of 11-12 |
Remaining work of
Earthwork in formation by filling and cutting earth, construction of RCC
culverts/wing wall/slabs/retaining wall/parapet wall/drains and other
ancillary works in connection with proposed B.G. Line between Manderhill
and Dumka from Ch. Km. 46.6 to 54.4 Km. and other ancillary works in
Hansdiha - Dumka section. |
Open |
30.8.11 |
Single |
12.10.11 |
4 nos(Four) |
- |
- |
L-1 |
CAO/C/WT/8779,dt.14.12.11 |
Maniraj Engicon(P)ltd.,
Kajubagan, Hehal Ratu Road,Ranchi-834005,Jhatkhand |
17.26 Crs |
6 (Six) Months |
|
65 of 11-12 |
Construction of Katoria end approach of ROB
65 including approach road and other related works in connection with
Banka - Katoria new B.G. Rail line work. |
Open |
16.9.10 |
Single |
25.10.11 |
4 nos(Four) |
- |
- |
L-1 |
CAO/C/WT/8814,dt.16.12.11 |
Civtect (I) Pvt. Ltd,
73/29, Golf Club Road Kolkata-33 |
5.92 Crs |
6 (Six) Months |
|
55 of 11-12 |
Linking of B G Track with 52 Kg Rail & PSC
sleeper with other ancillary works including laying of points & crossing
etc. between Azimganj Junction & Manigram in connection with Azimganj -
Manigram Doubling under Deputy Chief Engineer/ Con/ MLDT in Eastern
Railway. |
Open |
2.9.11 |
Single |
18.10.11 |
2 nos(Two) |
- |
- |
L-1 |
CAO/C/WT/8782,dt.20.12.11 |
M/s National Construction
& Trading Co., P.O. Raghunathpur, Purulia, pin-723133 |
3.53 Crs |
10 (Ten) Months |
|
62 of 11-12 |
Residual work for Earthwork in cutting and
embankment with mechanical compaction, supplying, spreading and
compaction of stone dust blanketing, linking of track and points &
crossing, supplying, stacking & spreading of machine crushed stone
ballast on cess, between stations Lebutola (excluding) (Km-18.07) and
Harua Road (including) (Km. 23.50) (Section-II) in connection with
doubling between Sondalia & Champapukur. |
Open |
16.9.11 |
Single |
8.11.11 |
3nos(Three) |
- |
- |
L-1 |
CAO/C/WT/8809,dt.21.12.11 |
MESA Constn,P-207,Goala
Para Road, Behala, Kolkata-60 |
9.13 Crs |
15 (Fifteen) Months |
|
43 of 11-12 |
Construction of 4 Nos. low height subway (L.H.S.)
including approach road & other related works in connection with Chandan
- Katoria new B.G. Rail line work. |
Open |
17.8.11 |
Single |
20.9.11 |
4 nos(Four) |
- |
- |
L-1 |
CAO/C/WT/8784,dt.26.12.11 |
Choubatia Constn. Pvt.
Ltd. Opp. Of cicuit House, Vijoynagar, Dist- Banka Pin-813102,Bihar |
3.51 Crs |
6 (Six) Months |
|
37 of 11-12 |
Supplying machine crushed stone ballast
on/or by the side of formation and spreading the same over formation for
doubling work from Azimganj Junction to Manigram under Dy.CE/CON/ER/MLDT. |
Open |
17.8.11 |
Single |
22.9.11 |
2 nos(Two) |
- |
- |
L-1 |
CAO/C/WT/8769,dt.29.12.11 |
M/s National Construction
& Trading Co., P.O. Raghunathpur, Purulia, pin-723133 |
3.40 Crs |
6 (Six) Months |
|
26 of 10-11 |
Construction of RUB of span (1x18.3m)
resting on pile foundation of 1.2 m dia with composite girder as
superstructure & construction of one RUB of span (1x76.2m) resting on
pile foundation of 1.5m dia with open web through girder as
superstructure alongwith other ancillary works in connection with
construction of New Line in between Dhubulia & Charatala. |
Open |
14.5.10 |
Single |
26.6.10 |
9 nos(Nine) |
- |
- |
L-1 |
CAO/C/WT/8540,dt.30.12.11 |
GPT Infra Project ltd., "Jeewansatya",
DD-6, Sector-I, Salt Lake City, kolkata-700064 |
15.09 Crs |
15 (Fifteen) Months |